The existing building is being completely renovated. On the upper floor, the new community hall is arranged over 2 floors. The library is installed on the ground floor and basement floor.The outer walls of the building on the eaves and gables are removed to the ceiling above the 1st floor. The best roof truss as well as the wooden beam ceilings above the 2nd floor, 1st floor and ground floor will be completely expanded. A new reinforced concrete floor will be installed over the basement, ground floor and upper floor in some areas. The outer walls are reinforced with reinforced concrete columns from ground floor to roof. There is a new building in the basement. Rooms for music associations are being created on the east side. Toilet facilities and shooting ranges with adjoining rooms are arranged in the north. In the West, the entire ventilation and heating technology is installed. EC: In the north-west, rooms are planned for the adult education center. Access is via the south side with information entrance hall. An information hall is planned in the south-east. Upper floor: On the north side, auxiliary rooms, changing rooms and cloakrooms are planned for the hall
Core quantities:
• outdoor facilities around buildings;
• soil removal approx. 250 m³;
• lawn area and planting bed approx. 250 m²;
• gravel substructure approx. 150 m³;
• granite paving approx. 350 m²;
• one-liner granite approx. 100 m;
• Two-layer granite approx. 50 m;
• granite slab covering approx. 130 m²;
• road rehabilitation along buildings;
• Mills asphalt approx. 720 m²;
• asphalt surface approx. 720 m²;
• street sinks approx. 2 pcs;
• Granite two-liner Homburg edge approx. 70 m;