Single-awarding framework agreement with purchase orders placed in open tender procedure pursuant to articles, R2124-2, R2162-2, R2162-4, R2162-13 and R2162-14 of the Public Order Code.
The contract is concluded without minimum and without maximum.
proof of non-allotment: need for the IRT and the selected service provider to optimize investments in order to make savings in terms of manufacturing and purchasing. The cost of manufacturing can be smoothed over the duration of the contract. The non-allotment will allow on the one hand, to have a better profitability of investments (in terms of equipment, furniture and others) and to limit the energy impact on the other hand.
The non-allotment will therefore make it possible to maintain overall coherence in terms of strategic positioning, as well as a control of costs and budgets that could be increased due to a plurality of interlocutors / service providers.
Single-awarding framework agreement with purchase orders placed in open tender procedure pursuant to articles, R2124-2, R2162-2, R2162-4, R2162-13 and R2162-14 of the Public Order Code.
The contract is concluded without minimum and without maximum.
proof of non-allotment: need for the IRT and the selected service provider to optimize investments in order to make savings in terms of manufacturing and purchasing. The cost of manufacturing can be smoothed over the duration of the contract. The non-allotment will allow on the one hand, to have a better profitability of investments (in terms of equipment, furniture and others) and to limit the energy impact on the other hand.
The non-allotment will therefore make it possible to maintain overall coherence in terms of strategic positioning, as well as a control of costs and budgets that could be increased due to a plurality of interlocutors / service providers.