L 136, replacement Rurbrücke Jülich.
Replacement construction of a 3-field bridge with a total length of approx. 85 m and a width of approx. 17.75 m.
Cycle path underpass with a length of approx. 18 m and a clear width of 4.0 m and a clear height of 2.50 m
The road works include:
Take up approx. 2,265 m2 of asphalt
approx. 10,000 m³ of earthwork including uptake of unbound base layers
approx. 1,200 m3 frost protection layer
approx. 1,040 t asphalt base layer for roadways and cycle paths
approx. 1,500 m² asphalt binder layer
approx. 760 m2 asphalt surface layer for cycle paths
approx. 2,600 m2 asphalt surface layer for roadways