L 602, Rußheim - Huttenheim, road construction, lot 5.
- Remove topsoil and attach: 3,300 m
- Remove topsoil and recycle: 630 m
- Supply topsoil: 1 400 m
- Loosen and install floor: 700 m
- Loosen and recycle floor: 3 000 m
- deliver and install floor / building material: 14 000 m
- carry out soil improvement: 12 000 m
- Produce the gravel base layer: 2 300 m
- produce asphalt foundation layer: 18 000 m
- Produce asphalt base course: 18 900 m
- Produce asphalt binder course: 18 900 m
- Produce asphalt surface course: 19 500 m
- Produce asphalt base layer: 4 200 m
- utilize contaminated asphalt material,
- Dispose of: 6 600 t,
- debited unb. Base course material
- Dispose of: 6 000 t,
- Set shelves of concrete: 1 250 m.