Replacing and renovating the Van Brienenoord bridge in a safe and sustainable way with predictable nuisance, so that the bridge – taking into account the intensity and load for the coming years – complies with the laws and regulations so that the connection of the A16 remains guaranteed.
The scope of the assignment mainly consists of:
1. A newly realized western arch bridge;
2. A renovated western arch bridge to replace the current eastern arch bridge;
3. CE marking for the bridge. This is obtained by:
(a) In the eastern arch bridge: newly constructed traps, installations and movement work;
(b) In the western arch bridge: parts replaced for CE marking;
c) For the entire bridge: new control, operation and monitoring.
See the already completed field with regard to the short description.