The measure replacement new building 2-3. BA with the building parts F1 and G is located in the southeast area of the property of the Friedrich Ebert Hospital (FEK) in Neumünster. Access to the construction site is via the Sachsenring road. The building part F1 is surrounded by buildings almost on all sides. The building part F1 borders directly on existing building parts in which the hospital operation continues. In the peripheral areas of the construction site it is therefore necessary to act with special care. The building part G is designed as a complete new building on an existing open space and connected via F1.
- 117 St. washbasin systems,
- 57 St. WC systems,
- 6 St. handicapped toilet facilities,
- 7 pieces of showers,
- 16 pcs bedpan washers,
- approx. 2,000 m sewers,
- approx. 1 100 m rainwater pipes,
- approx. 6,500 m drinking water pipes,
- Approx. 240 m dry fire extinguisher pipes.