Section 1: For the construction of a mobile flood barrier, an aluminium dam beam system with fixed and loose supports is proposed.
Section 2: The flood protection gate at the bridge in Bischleben is to be manufactured as a 2-leaf lift-swing door made of steel.
- Development of the structural design for LP 1 - 6 according to the performance profile § 51 for the flood protection measures of the two sections
- Verification of static calculations
- Koordnierungsleistungen