1. The subject of the order is the delivery and installation of photovoltaic installations and solar collectors and biomass boilers in the municipality of Uścimów. The order is implemented as part of the project “RES Investment in the Municipality of Uścimów” co-financed by the EU under the Regional Operational Programme of Lublin Voivodeship 2014-2020 priority axis 4 environmentally friendly energy action 4.1. Support for the use of RES.
2. The Contracting Authority pursuant to Article 91 of the Pzp Act allows the submission of partial tenders, broken down into three parts of the contract:
1) Part 1 — delivery and installation of photovoltaic cells;
2) Part 2 — delivery and assembly of solar collectors;
3) Part 3 — delivery and assembly of biomass boilers.
Supply and installation of photovoltaic cellsThe subject of Part 1 of the order is the delivery and installation of sets of photovoltaic installations within the municipality of Uścimów, including, inter alia:
1) supply and installation of 24 pcs of photovoltaic installations with a power of min. 3.1 kW, in 24 indicated locations, including 15 installations mounted on an apartment building, 4 installations mounted on a farm building, 5 installations mounted on the ground,
2) supply and assembly of 16 pcs of photovoltaic installations with a power of min. 4.34 kW, in 16 indicated locations, including 8 installations mounted on an apartment building, 8 installations mounted on a farm building,
3) supply and installation of 28 pcs of photovoltaic installations with a power of min. 4.96 kW, in 28 indicated locations, including 13 installations mounted on a residential building, 9 installations mounted on a farm building, 6 installations mounted on the ground,
4) installation made on the basis of modules of monocrystalline photovoltaic panels with a power of min. 340 W,
5) installation of support structures of photovoltaic modules,
6) installation of photovoltaic panels on the structure,
7) installation of solar wiring between modules and inverter,
8) making the main installation for connecting the inverter to the main switchboard of the building,
9) installation of the RDC DC DC circuit switchgear,
10) assembly of the inverter,
11) installation of RAC switchgear switchgear switchgear unit,
12) the performance of anti-shock protection,
13) the performance of surge protection,
14) trials, measurements, adjustment and technological start-up of the plant,
15) the execution of abbreviated post-construction documentation for each project participant and full post-construction documentation for the Contracting Authority (certificates, guarantees, instructions for operation, implementation projects, set of electrical measurements, set of documents to change the meter, documentation received from Ordering Party with red-colored corrections),
16) connection to the PGE Distribution S.A. network, together with the preparation of a set of documents and the declaration of installation,
17) training Users in the proper operation of the installations performed,
18) drawing up service instructions containing the necessary information on how to proceed in the event of unexpected errors in the installation,
19) Programming and commissioning of the installation,
20) supplement possible cavities of walls, ceilings, sealing the roofing material after the passages of the wires,
21) other elements included in Annex No 8a to the SWZ (design documentation) and the contract template of Annex 7a to the SWZ).
Delivery and assembly of solar collectorsThe subject of Part 2 of the order is the delivery and installation of sets of solar installations in the territory of the municipality of Uścimów, including, inter alia:
1) two-collector installation/200 dm3, 5 sets — installation for 5 locations,
2) three-collector installation/300 dm3, 1 set - assembly for 1 location,
3) the installation of the solar tray,
4) the installation of glycol installation,
5) installation of the pump and control unit,
6) the connection of the solar tray to the existing cold water and hot water installation, together with the necessary control and protection fittings, dam and regulatory fittings,
7) the execution of tests, tests and commissions of the solar installation,
8) the performance of the training of the users of the solar installation,
9. Supply and assembly, based on the technical documentation set out in Annex No 8b to SWZ, of sets of flat solar collectors for the preparation of hot water,
10) supplement possible cavities of walls, ceilings, sealing of roofing material after passages of wires,
11. Other elements included in Annex No 8b to SWZ (design documentation) and the contract template of Annex 7b to SWZ.
Delivery and assembly of biomass boilersThe subject of Part 3 of the order is the delivery and installation of biomass boilers within the municipality of Uścimów, including, inter alia:
1) supply and assembly of 4 units of biomass boilers with a power of 20 kW, assembly for 4 locations,
2) disassembly of the old boiler and elements of the installation, which will be replaced (forwarding to the owner),
3) installation of boiler, fittings and equipment, thermal insulation of pipelines according to the technical documentation, applicable legal conditions, technical construction,
4) installation of the control system,
5) installation of a suppress with a clasp and attachment of the boiler to the existing flue duct of the chimney,
6) connection of the boiler to the existing installation c.o., z.w., c.w.u. within the room where the boiler is installed to the extent necessary for the proper operation of the installation in automatic mode according to the technical documentation,
7) manufacture of rinsing, pressure tests of the installation, filling, venting and commissioning of the installation,
8) to provide instructions and train the User in the correct and safe operation of the installation and its maintenance,
9) replenishment, sealing cavities after the passages of the ducts,
10) commissioning and participating in the technical reception of the installation,
11) before the installation of the boiler, it is advisable to establish the conditions of installation in the indicated location min. under the account of the location of the pellet tray and other relevant installation parameters,
12) transfer to the Ordering Authority a protocol for the reception of the boiler room, training and transfer of documentation confirmed by the User,
13. Other elements included in Annex 8c to SWZ (design documentation) and the contract template of Annex 7c to SWZ.