Road construction works | Tenderlake

Road construction works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 July 2022
Closing Date:
30 August 2022
Location(s):
DE134 Ortenaukreis (DE Germany/DEUTSCHLAND)
Description:
Development of Rheinstraße Nord, northern part, 1st construction phase

The canal and road construction work "GG Rheinstraße Nord" is located in Lahr and is located in the immediate vicinity of the Lahr airfield. A fundamental renovation and redesign of Rainer-Haungs-Straße and the eastern part of David-Schieni-Straße is to take place. The traffic facilities will be fully developed over the entire width of the future road cross-section with around 16,000 m2. The newly constructed mixed water and rainwater channels with a dimensioning of DN 300 up to rectangular profile 1400/800 and a total length of approx. 2450 m will be manufactured for the reorganization of the drainage system in the entire planning area "GG Rheinstraße Nord". In the course of this reorganization, a lamellar clarifier and two shafts with flushing contactor will be installed as engineering structures. In addition, the existing DA 225 water pipe and DA225 gas pipeline will be renewed or rerouted in some areas. Furthermore, a KMR-DR DN125/500 district heating pipe will be laid. Furthermore, power cables are also laid by the Überlandwerk Mittelbaden.

Quantities:

Los 1: - Straßenvollausbau : ca. 16.000 m2

- Disposal of excavated/surface road construction:

ca. 20.000 t

- Boards and gutters: approx. 8000 m

- Trench excavation including shoring canal construction:

ca. 15.800 m3

- Rainwater and mixed water channel DN 300 to

RE 1400/800: ca. 2.450 m

- shafts, tangential shafts and

Shaft structures : approx. 57 pieces

Lot 2: - Delivery and installation of street lighting:

approx. 33 pieces

Traffic facilities and civil engineering structure

The canal and road construction work "GG Rheinstraße Nord" is located in Lahr and is located in the immediate vicinity of the Lahr airfield. A fundamental renovation and redesign of Rainer-Haungs-Straße and the eastern part of David-Schieni-Straße is to take place. The traffic facilities will be fully developed over the entire width of the future road cross-section with around 16,000 m2. The newly constructed mixed water and rainwater channels with a dimensioning of DN 300 up to rectangular profile 1400/800 and a total length of approx. 2450 m will be manufactured for the reorganization of the drainage system in the entire planning area "GG Rheinstraße Nord". In the course of this reorganization, a lamellar clarifier and two shafts with flushing contactor will be installed as engineering structures. In addition, the existing DA 225 water pipe and DA225 gas pipeline will be renewed or rerouted in some areas. Furthermore, a KMR-DR DN125/500 district heating pipe will be laid. Furthermore, power cables are also laid by the Überlandwerk Mittelbaden.

Quantities:

- Straßenvollausbau : ca. 16.000 m2

- Disposal of excavated/surface road construction:

ca. 20.000 t

- Boards and gutters: approx. 8000 m

- Trench excavation including shoring canal construction:

ca. 15.800 m3

- Rainwater and mixed water channel DN 300 to

RE 1400/800: ca. 2.450 m

- shafts, tangential shafts and

Shaft structures : approx. 57 pieces

Creating street lighting

Delivery and installation of street lighting: approx. 33 pieces

Download full details as .pdf
The Buyer:
Stadt Lahr
CPV Code(s):
34928500 - Street-lighting equipment
45232421 - Sewage treatment works
45233120 - Road construction works
45247110 - Canal construction