The construction project involves the renovation, energy upgrading and optimizing the design and architectural history of the former Carmelite monastery in Boppard, which is now used as a city administration (also called Carmelite or administrative building in the following). The building is a listed building and is located in the core area of the city of Boppard. There is a church in the north. On the east side, Karmeliterstraße runs parallel to the building. On the south side, the entrance for the adjacent car park “Karmeliterstraße” is immediately adjacent.
The 20s - Wärmeversorgungsanlagen
- 3 air/water heat pump, split version for heating
- 1 gas condensing boiler
- 2200 m C-steel pipeline incl. fittings and insulation
- 50 m stainless steel piping system incl. fittings and insulation
- 1 piece compact distributor forward/return
- 8 pumps incl. accessories
- 2 pieces of membrane pressure expansion vessel for closed heating system
- 1 piece of underfloor heating surfaces for heating with distributors including the necessary control fittings
- 1700 m heating pipe copper incl. fittings
- 9250 m multilayer composite pipe incl. accessories
- 21 heating circuit distributors incl. cabinet and accessories
- 41 compact flat radiators
- 9 pieces of tubular radiators