New construction of the vocational school centre in Constance - drywall construction work on buildings GT1 and GT2
Drywall work for the GT1 and GT2 components
Higher-level services / construction site equipment
Drywall work walls
• Partition wall without fire protection requirements
• Partition wall with fire protection requirements
• Facing shells and shaft walls
• Wandbekleidungen
• Deckenbekleidungen
Drywall ceilings
• Gypsum board ceilings
• Acoustic suspended ceilings
Hauptmassen GT1
Partition wall without fire protection requirements 640 m2
Partition wall with fire safety requirements 176 m2
Facing shells and shaft walls 296 m2
Wandbekleidungen 320 m2
Deckenbekleidungen 115 m2
Gypsum board ceilings 45 m2
Acoustic suspended ceilings 1,975 m2
Hauptmassen GT2
Partition wall without fire protection requirements 1,460 m2
Partition with fire safety requirements 215 m2
Facing shells and shaft walls 700 m2
Wandbekleidungen 375 m2
Deckenbekleidungen 133 m2
Gypsum board suspended ceilings 161 m2
Acoustic suspended ceilings 2,486 m2