earthwork
- Loosening soil conveying storage 0.5km: 3.100m3
- Dispose of soil Z0: 5.000t
- Dispose of soil Z1.1 to Z2: 1,800t
- Preparation of construction roads d=20xcm: 4.700m2
Earthworks – shoring
- Floor supply install traffic area slope 1:2 GW GI: 2.800m3
- Soil in the embankment area, loose storage: 5.500m3
Higher-level shoring services
- Setting up a construction site: 1 hour
- Geotechnisches Messprogramm: 1psch
Verbauarbeiten:
- Trägerbohlwand: 574m2
- Verpressanker: 630m
Demolition, clearing
- Tree felling: 35 pcs
- Clearing shrub area: 500m2
- Shredding and clearing turf: 6,500m2
- Topsoil removal: 1.680m3
- Dispose of municipal waste, garden and park waste: 130t
- Dispose of soil Z0: 2.000t
- Pick up the garage, move it 1 hour
- Topsoil application: 130m3
- Sew lawn: 500m2
- Fertigstellungspflege: 500m2
earthwork
- Loosening soil conveying storage 0.5km: 3.100m3
- Dispose of soil Z0: 5.000t
- Dispose of soil Z1.1 to Z2: 1,800t
- Preparation of construction roads d=20xcm: 4.700m2
Earthworks – shoring
- Floor supply install traffic area slope 1:2 GW GI: 2.800m3
- Soil in the embankment area, loose storage: 5.500m3
Higher-level shoring services
- Setting up a construction site: 1 hour
- Geotechnisches Messprogramm: 1psch
Verbauarbeiten:
- Trägerbohlwand: 574m2
- Verpressanker: 630m
Demolition, clearing
- Tree felling: 35 pcs
- Clearing shrub area: 500m2
- Shredding and clearing turf: 6,500m2
- Topsoil removal: 1.680m3
- Dispose of municipal waste, garden and park waste: 130t
- Dispose of soil Z0: 2.000t
- Pick up the garage, move it 1 hour
- Topsoil application: 130m3
- Sew lawn: 500m2
- Fertigstellungspflege: 500m2