Carrying out drywall construction work as part of the extension of the all-day program at the Fritz-Erler-Schule in 61206 Wöllstadt (OT Ober-Wöllstadt).
General Construction Description
In the course of the expansion of the all-day care, a two-storey, basement extension is being built in the south-western area of the property. The new building will be attached to the existing non-basement school building. The two buildings are not connected. The extension is barrier-free.
The technical rooms, a storage room and several sanitary facilities are located in the
Basement arranged. A storage room for the caretaker and a changing room for the staff are also planned.
On the ground floor there is a canteen area with cooking kitchen, two offices, a
Cleaning agent room and two further sanitary facilities provided. In addition, a multi-purpose room is planned, which can be connected to the dining room.
In addition to the two group rooms, the specialist room for
Art and an adjoining room Art is created. In addition, a library and a differentiation room are planned.
On the north side, two staircases are being built, which are accessible from the schoolyard. Barrier-free access to the floors takes place in the north-east staircase via an elevator system. The second escape and rescue route is also via this staircase, through a direct exit to the outside.
The existing toilet wing was demolished in advance.
The above-ground outer walls of the building are erected as solid walls as masonry walls. The outer walls of the basement are made of WU concrete.
The work will be carried out during ongoing school operations
Trockenbauarbeiten:
- Metal stud walls, d = 12.5cm - 20.0 cm, F0, F30 and F90 approx. 483 m2
- Vorsatzschale, F0, F30 ca. 191 m2
- Sliding ceiling connection, d = 12.5 - 30.0 cm, F0, F30, F90 approx. 145 m
- Wall openings, F0, F30, F90 approx. 36 pcs
- Door openings, F0 + F30, approx. 38 pcs
The wall heights are from approx. 2.95m - 3.90m.
Main dimensions of "drywall works" for the preparation of the publication text:
Wall height basement: approx. 2.95m
Wall height ground floor: approx. 3.90m
Wandhöhe OG: approx. 3,465m
Trockenbauarbeiten:
approx. 120 m² metal stud wall, F0, d = 125mm
approx. 13 m² metal stud wall, F0, d = 150mm
approx. 50 m² metal stud wall, F0, d = 200mm
approx. 160 m² metal stud wall, F30, d = 125mm
approx. 50 m² metal stud wall, F30, d = 150mm
approx. 90 m² metal stud wall, F90, d = 125mm
ca. 8 m² Sturzverkleidung, F30, d = 100mm
ca. 3 m² Sturzverkleidung, F90 d = 125mm
approx. 191 m² Vorsatzschale, F0 + F30
approx. 145 m sliding ceiling connection, F0 + F30 + F90
approx. 36 pcs wall openings, F0 + F30 + F90
approx. 38 pcs make door opening, F0 + F30
planned execution period :
CW 7 - CW 14, 2024