Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is lot 15 - electrical work (heavy current and telecommunications technology) with the following main dimensions:
- approx. 11 sub-distributors,
- central battery,
- approx. 875 lights (indoor area),
- approx. 13 mast lights (outdoor area),
- approx. 28,000 m of installation lines and laying systems,
- KNX bus systems,
- approx. 3,000 m bus cable and laying systems,
- approx. 8 500 m data lines,
- approx. 700 installation devices.