Subject of the submission are the floor coverings (hard concrete), which will be delivered and installed between July 2019 and 2020 at the different parts of the building. The scope is described in detail in the service specification LV and is reproduced here only in short form:
- Polymer bitumen waterproofing membranes approx. M
- XPS insulation approx. M
- hard concrete coverings approx. M
- Resin coverings approx. M
Subject of the submission are the floor coverings (hard concrete), which will be delivered and installed between July 2019 and 2020 at the different parts of the building. The scope is described in detail in the service specification LV and is reproduced here only in short form:
- Polymer bitumen waterproofing membranes approx. M
- XPS insulation approx. M
- hard concrete coverings approx. M
- Resin coverings approx. M