Construction site equipment 3 bus ports
- 19 construction site power distributors (meter, main, group and final distributors)
- 500 St/Mt Vorhaltezeiten
- 2350 m Gummischlauchleitung, H 07 RN-F 3G1.5 – 5G150mm²
- 17 pcs device connections up to 5 x 150 sqmm
- 25 pcs heat-shrink connection sleeve up to 5 x 35 sqmm
- 2 pcs construction lighting construction site outdoor
- 1 pc construction lighting traffic zone outdoor