Park & Ride facility Hemmingen End point
This specification includes the construction of the car park, the earthworks,
the construction of the cable conduit system, the rainwater pipe, as well as board, gutter
Paving work and the dismantling of part of the existing construction road.
In addition, the existing rainwater retention basin must be removed after the dismantling of the
Construction road can be extended on one side.
In a previous construction project, the base courses and a
temporary asphalt surface in the area of the Park & Ride car park already
Realized. The temporary asphalt surface must be dismantled. The top
Layer of the installed gravel base layer is to be removed outside the asphalt surfaces
be withdrawn and renewed.
The Park & Ride facility will not be released for the MIV until the Park & Ride
The plant has been completed. In the area between the roundabout and the access road
Construction site traffic by third parties from other roads and
Track construction companies.