Road-repair works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 March 2023
Closing Date:
14 April 2023
Location(s):
PL81 Lubelskie (PL Poland/POLSKA)
Description:
Partial repairs of bituminous surfaces and removal of the effects of breakthroughs in 2023 on provincial roads administered by the Provincial Roads Authority in Lublin Task 3,4,5,7,8,12

1. The subject matter of the contract shall be works consisting of:

partial repairs of bituminous surfaces and removal of the effects of breakthroughs in 2023 on provincial roads administered by the Provincial Roads Authority in Lublin. The detailed material scope, quantities of works and partial renovation technologies will be determined after the spring inspections on the day of the protocol handover of the construction site.

2. The Contractor is obliged to ensure safe conditions of vehicular and pedestrian traffic in the area of the works covered by the contract on the basis of the Simplified Traffic Organization Project (for the duration of the works) prepared by the ZDW in Lublin and submitted to the Contractor after signing the contract, approved by the Traffic Manager on provincial roads.

3. The Contracting Authority permits the possibility of submitting partial tenders.

4. The Contracting Authority provides for annulment of the proceeding within the meaning of Article 257 of the

Task No. 3: Region of Provincial Roads in Chełm

1) Partial repairs of road surfaces – Region of Provincial Roads Road Circuit in Chełm:

- Filling cavities with mineral and asphalt mixture AC11S (with framing) – 800,00 Mg

- Filling cavities with mineral and asphalt mixture AC11S (without framing) – 1,00 Mg

- Filling cavities with mineral and asphalt mixture from the recycler – 1.00 Mg

- Surface fixation – depth 1.5 cm – 100.00 m2

- Surface fixation – depth 3.0 cm – 650.00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 100.00 m2

- Replacement of the abrasive layer min. 4 cm with mineral and asphalt mixture AC11S 50/70 KR 3-4 together with milling, purification and sprinkling of an area above 50 m2 — 60,00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and dribbling with an area above 3000 m2 – 3 060,00 m2

- Filling the ruts bet. asphalt AC11 S with milling with an area above 50 m2 – 470,00 Mg

- Milling pavement average thickness 4 cm — 100,00 m2

- Making a binding layer of mineral and asphalt mixture AC16W 35/50 KR 3-4 about 6 cm min. 6 cm with purification and sprinkling — 600,00 m2

- Making an abrasive layer of mineral and asphalt mixture AC11S 50/70 KR 3-4 gr 4 cm with purification and sprinkling — 600,00 m2

- Supplementing the roadsides with aggregate (material of the Ordering Party) to a thickness of min. 10 cm with profiling and compaction of the substrate – 1.00 m2

- Supplementing the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate – 200,00 m2

- Elimination of transverse and longitudinal cracks – 6.00 m

2) Renovation of gorges – 50.00 m2, including:

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 50.00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 gr 6 cm with cleaning and dribbling – 50,00 m2

- Execution of the foundation layer from the mineral and asphalt mixture AC22PW 35/50 KR 3-4o gr. 8 cm with cleaning and dribbling – 50,00 m2

- Making a foundation layer from an unbound C90/3 mixture - crushed aggregate stab. mechanically 0-31,5mm with a thickness of 20 cm – 50,00 m2

- Execution of the foundation from a mixture bound with C5/6 cement - soil stabilized with cement 5 MPa with a thickness of 15 cm - 50.00 m2

- Demolition of the surface thickness 38-53 cm – 50.00 m2

Task No. 4: Region of Provincial Roads in Chełm.

1) Partial repairs of road surfaces – Region of Provincial Roads Road Circuit in Krzczonów:

- Filling cavities with mineral and asphalt mixture AC11S (with framing) – 600,00 Mg

- Filling cavities with mineral and asphalt mixture AC11S (without framing) – 1,00 Mg

- Filling cavities with mineral and asphalt mixture from the recycler – 1.00 Mg

- Surface fixation – depth 1.5 cm – 100.00 m2

- Surface fixation – depth 3.0 cm – 2 640.00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 100.00 m2

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mixture AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 50 m2 – 60.00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and dribbling with an area above 3000 m2 – 3 060,00 m2

- Filling the ruts bet. asphalt AC11 S with milling with an area above 50 m2 – 590,00 Mg

- Surface milling: average thickness 4 cm – 100,00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 with a thickness of min. 6 cm with cleaning and dribbling – 600,00 m2

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and dribbling – 600.00 m2

- Supplementing the roadsides with aggregate (material of the Ordering Party) to a thickness of min. 10 cm with profiling and compaction of the substrate – 1.00 m2

- Supplementing the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate – 200,00 m2

- Elimination of transverse and longitudinal cracks – 6.00 m

2) Renovation of gorges – 50.00 m2, including:

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 50.00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 gr 6 cm with cleaning and dribbling – 50,00 m2

- Execution of the foundation layer from the mineral and asphalt mixture AC22PW 35/50 KR 3-4o gr. 8 cm with cleaning and dribbling – 50,00 m2

- Making a foundation layer from an unbound C90/3 mixture - crushed aggregate stab. mechanically 0-31,5mm with a thickness of 20 cm – 50,00 m2

- Execution of the foundation from a mixture bound with C5/6 cement - soil stabilized with cement 5 MPa with a thickness of 15 cm - 50.00 m2

- Demolition of the surface thickness 38-53 cm – 50.00 m2.

Task No. 5: Region of Provincial Roads in Hrubieszów.Road Circuit in Hrubieszów.

1) Partial repairs of road surfaces – Region of Provincial Roads Road Circuit in Hrubieszów:

- Filling cavities with mineral and asphalt mixture AC11S (with framing) – 602,00 Mg

- Filling cavities with mineral and asphalt mixture AC11S (without framing) – 20,00 Mg

- Filling the cavities with a mineral-asphalt mixture from the recycler – 10.00 Mg

- Surface fixation – depth 1.5 cm – 70.00 m2

- Surface fixation – depth 3.0 cm – 50.00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 50.00 m2

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 50 m2 – 208,00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 3000 m2 – 3 705,00 m2

- Filling the ruts bet. asphalt AC11 S with milling with an area above 50 m2 – 310,00 Mg

- Surface milling: average thickness 4 cm – 200,00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 with a thickness of min. 6 cm with cleaning and dribbling – 150,00 m2

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and dribbling – 150.00 m2

- Supplementing the roadsides with aggregate (material of the Ordering Party) to a thickness of min. 10 cm with profiling and compaction of the substrate – 2 000,00 m2

- Supplementing the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate – 100,00 m2

- Elimination of transverse and longitudinal cracks – 50,00 m

2) Renovation of gorges – 182.00 m2, including:

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 182.00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 gr 6 cm with cleaning and sprinkling – 182,00 m2

- Execution of the foundation layer from the mineral and asphalt mixture AC22PW 35/50 KR 3-4o gr. 8 cm with cleaning and sprinkling – 182,00 m2

- Making a foundation layer from an unbound C90/3 mixture - crushed aggregate stab. mechanically 0-31,5mm with a thickness of 20 cm – 182,00 m2

- Execution of the foundation from a mixture bound with C5/6 cement - soil stabilized with cement 5 MPa with a thickness of 15 cm - 182.00 m2

- Demolition of the surface thickness 38-53 cm – 182.00 m2.

Task No. 7: Region of Provincial Roads in Lublin z/s in Bychawa.Road Circuit in Bełżyce.

1. Performing partial repairs of road pavement — Regional Roads District Road Region in Bełżyce:

- Filling cavities with mineral and asphalt mixture AC11S (with framing) — 200,00 Mg

- Surface fixation – depth 1.5 cm – 1 000,00 m2

- Surface fixation — depth 3.0 cm — 100,00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 1 500.00 m2

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 50 m2 – 350,00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 3000 m2 – 3 010,00 m2

- Filling the ruts bet. asphalt AC11 S with milling with an area of over 50 m2 – 50,00 Mg

- Milling pavement average thickness 4 cm — 1 000,00 m2

- Making a binding layer of mineral and asphalt mixture AC16W 35/50 KR 3-4 min. 6 cm with purification and sprinkling — 1 000,00 m2

- Making an abrasive layer of mineral and asphalt mixture AC11S 50/70 KR 3-4 g 4 cm with purification and sprinkling — 1 000,00 m2

- Supplementing the roadsides with aggregate (customer's material) to a thickness of min. 10 cm with profiling and compaction of the substrate – 605,00 m2

- Supplementing the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate – 605,00 m2

- Elimination of transverse and longitudinal cracks – 60.00 m

2. Renovation of gorges –0.00 m2

Task No. 8 : Region of Provincial Roads in Lublin z/s in Bychawa.Road Circuit in Krzczonów.

1. Performing partial repairs of road pavement — District of Provincial Roads Road Region in Krzczonowo

- Filling cavities with mineral and asphalt mixture AC11S (with framing) — 200,00 Mg

- Surface fixation — depth 1,5 cm — 600,00 m2

- Surface fixation – depth 3.0 cm – 150.00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 1 180.00 m2

- Replacement of the abrasive layer gr. min. 4 cm from mineral and asphalt mixture AC11S 50/70 KR 3-4 together with milling, purification and sprinkling of an area above 50 m2 — 220,00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and dribbling with an area above 3000 m2 – 5 870,00 m2

- Filling the ruts bet. asphalt AC11 S with milling with an area above 50 m2 – 220,00 Mg

- Surface milling: average thickness 4 cm – 900,00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 with a thickness of min. 6 cm with cleaning and dribbling – 125,00 m2

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 125.00 m2

- Supplementing the roadsides with aggregate (material of the Ordering Party) to a thickness of min. 10 cm with profiling and compaction of the substrate – 490,00 m2

- Supplementing the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate – 490,00 m2

- Elimination of transverse and longitudinal cracks – 190.00 m

2. Renovation of gorges – 60.00 m2, including:

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 60.00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 gr 6 cm with cleaning and drizzling – 60,00 m2

- Execution of the foundation layer from the mineral and asphalt mixture AC22PW 35/50 KR 3-4o gr. 8 cm with cleaning and sprinkling – 60,00 m2

- Making a foundation layer from an unbound C90/3 mixture - crushed aggregate stab. mechanically 0-31,5mm with a thickness of 20 cm – 60,00 m2

- Execution of the foundation from a mixture bound with C5/6 cement - soil stabilized with cement 5 MPa with a thickness of 15 cm - 60.00 m2

- Demolition of the surface thickness 38-53 cm – 60.00 m2.

Task No. 12: Region of Provincial Roads in Zamość.Road Circuit in Biłgoraj

1) Partial repairs of road surfaces – Region of Provincial Roads Road Circuit in Biłgoraj:

- Filling cavities with mineral and asphalt mixture AC11S (with framing) – 400,00 Mg

- Filling cavities with mineral and asphalt mixture AC11S (without framing) – 50,00 Mg

- Filling cavities with mineral and asphalt mixture from the recycler – 30.00 Mg

- Surface fixation – depth 1.5 cm – 3 500.00 m2

- Surface fixation — depth 3,0 cm — 1,500,00 m2

- Surface fixation – elimination of carcinoma, fatigue cracks (mesh) – 1 500.00 m2

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mixture AC11S 50/70 KR 3-4 with milling, cleaning and sprinkling with an area above 50 m2 – 200,00 Mg

- Replacement of the wear layer gr. min. 4 cm from mineral and asphalt mix AC11S 50/70 KR 3-4 with milling, cleaning and dribbling with an area above 3000 m2 – 0 m2

- Filling of ASphalt ruts AC11 S with milling with an area above 50 m2 — 200,00 Mg

- Milling pavement average thickness 4 cm — 100,00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 with a thickness of min. 6 cm with cleaning and dribbling – 300,00 m2

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 300.00 m2

- Complement the roadsides with aggregate (contracting material) to a thickness of min. 10 cm with profiling and compaction of the substrate — 1 000,00 m2

- Complement the roadsides with aggregate to a thickness of min. 10 cm with profiling and compaction of the substrate — 1 000,00 m2

- Liquidation of transverse and longitudinal cracks — 80.00 mb

2) Renovation of gorges – 100.00 m2, including:

- Making a wear layer from mineral and asphalt mixture AC11S 50/70 KR 3-4 with a thickness of 4 cm with cleaning and sprinkling – 100.00 m2

- Making a binding layer from mineral and asphalt mixture AC16W 35/50 KR 3-4 gr 6 cm with cleaning and sprinkling – 100,00 m2

- Making a foundation layer of mineral and asphalt mix AC22PW 35/50 KR 3-4o gr. 8 cm with cleaning and dribbling – 100,00 m2

- Making a foundation layer from an unbound C90/3 mixture - crushed aggregate stab. mechanically 0-31,5mm thick 20 cm – 100,00 m2

- Execution of the foundation from a mixture bound with C5/6 cement - soil stabilized with cement 5 MPa with a thickness of 15 cm - 100.00 m2

- Demolition of the surface thickness 38-53 cm – 100.00 m2.