The municipal company Stadtwerke Weiden idOpf is responsible for the new construction of the depot.
The new depot to be built is directly adjacent to the new construction of the waterworks.
The depot is located between Neustädter-Strasse and Georg-Stöckel-Strasse in the north of the city.
Cassette walls:
Steel cassette profile wall approx. 2,650 m²
Thermal insulation wall cassette felt approx. 2,650 m²
Steel substructure steel cassette section wall approx. 24,000 kg
edging profiles for openings approx. 200 m
Facade cladding:
Light metal substructure solid construction approx. 1,400 m²
substructure, steel cassette wall approx. 2,600 m²
Thermal insulation mineral wool on solid components, 160 mm approx. 1200 m²
Cassette facade made of aluminium composite elements approx. 3750m²
Window venetian blinds:
Window blinds 80 mm approx. 53 m