On the school grounds of Pater-Wilhelm-Fink-Strasse 18, an extension is to be built with a connecting corridor to the existing building: Metal construction work DIN 18358 Execution period: KW 14/2021 –KW 15/2021:
The primary and middle school of Rottenburg ad Laaber is located at Pater-Wilhelm-Fink Straße 18. An extension to the school is to be built on the associated school playground. A connecting corridor should also be created between the existing and the new building. The following approximate information is relevant for the measure: - 225 m