2021-6615-00033_Berthold Haupt-Straße from Am Alten Elbarm to August-Röckel-Straße including B 0088 00 a.l. Lockwitzbach — HWSB2013 (RVK No. 611) including Ulmenstrasse_Lot 1 track, road and civil engineering.
— 3 950 m
— 2 300 m
— 1,910 m opening of frame track,
— remove 2 580 m
— take 870 m board,
— eliminate 360 m
— make 70 m
— produce 680 m
— set 630 m of natural stone shelves,
— set 80 m concrete shelves
— 290 m
— 1 890 m installation of single track (Dresden fixed roadway system),
— 5 990 m
— 2 980 m
— Eliminate 1 870 m
— remove 1 735 m
— remove 40 m
— take up 1,925 m board,
— remove 2 470 unbound base layers,
— 460 m
— 560 m connection cables DN 160 PP,
— 660 m drainage channel DN 250 PP,
— 15 bays DN 1000-1200 — 1 shaft DN 600,
— produce 2 020 m
— produce 340 m
— produce 430 t asphalt base layer,
— produce 47 t asphalt binder,
— produce 140 t asphalt topcoat,
— produce 3 500 m
— make 1 130 m
— produce 30 m
— set 1 480 m of natural stone shelves,
— set 480 m concrete board,
— 1 015 m paving row set natural stone,
— set 1 180 m paving gutter natural stone,
— make 73 m
— accompanying landscape management measures (64 new tree planting),
— make 20 m of tube railings,
— make 125 m fence,
— 12 pcs bays DN 1000 DN 1500,
— 1 pcs special buildings,
— 10 pcs. shaft renovation,
— 137 m new canal construction DN 250-400 Stz,
— 177 m new canal building KM EI 250/375 — 800/1200 B,
— 274 m sewer rehabilitation (GRP hose liner) KM EI 300/450 — 400/600 B,
— 1 790 m line ditch civil engineering services for SaxonEnergie Fm, 13 pcs cable ducts, 2 distribution cabinets,
— 1 076 m line ditch civil engineering services for SaxonEnergie elt, 1 distribution cabinet,
— 308 m pipe ditch civil engineering services for SaxonEnergy gas,
— 50 m digging civil engineering services for SaxonEnergie TW, 854 m civil engineering services for OEB,
— 308 m civil engineering services for LSA, 4 pcs cable ducts,
— 1 271 m line ditch civil engineering services Vodafone, 3 pcs cable ducts,
— 13.5 m thermowell St 711 x 10.0 civil engineering services for common media culverts,
— 120 m
— 730 m
— 42 d groundwater reduction,
— 200 m
— 160 m in-situ concrete bored piles
— 121 m
— 64 m
— 37 m
— 30 t rebar,
— 112 m
— make 115 m
— 40 m steel railings,
— 150 m
— 85 m