Construction work | Tenderlake

Construction work

Contract Value:
PLN 27M - 27M
Notice Type:
Contract Notice
Published Date:
30 March 2022
Closing Date:
11 April 2022
Location(s):
PL843 Suwalski (PL Poland/POLSKA)
Description:
Olympic Augustów — halls, pitches, treadmills — expansion of sports and recreational infrastructure in the spa

1. The subject of the order is the Investment: Olympic Augustów — halls, pitches, treadmills — expansion of sports and recreational infrastructure in the spa.

2. The order was divided into 3 tasks:

Task 1: Modernization of the gymnasium and its facilities in the building of Primary School No. 3 (near Zespole Szkolno — Kindergarten No. 2) and the expansion of the building of Primary School No. 2 (at Zespole Szkolno — Kindergarten No. 3) with a full-size gymnasium together with facilities and reconstruction football field with athletics treadmill in Augustów. As part of Task 1, 3 objects were extracted:

Object 1A: Modernization of the gym and its facilities in the building of Primary School No. 3 (at Zespole Szkolno — Kindergarten No. 2) at Mickiewicza Street in Augustów, which includes:

• Modernization of the gym and its facilities,

• construction of treadmill in SP No. 3.

Object 1B: Expansion of the Primary School Building No. 2...

THE FURTHER PART OF THE DESCRIPTION IS PROVIDED IN THE SWZ

Modernization of the gymnasium and its facilities in the building of Primary School No. 3 (at Zespole Szkolno — Kindergarten No. 2) and the extension of the building of Primary School No. 2 (at Zespole Szkolno — Prze

As part of Task 1, 3 objects were extracted:

Object 1A: Modernization of the gym and its facilities in the building of Primary School No. 3 (at Zespole Szkolno — Kindergarten No. 2) at Mickiewicza Street in Augustów, which includes:

• Modernization of the gym and its facilities,

• construction of treadmill in SP No. 3.

Facility 1B: Expansion of Primary School building No. 2 (at Zespole Szkolno — Kindergarten No. 3) with a full-size gymnasium together with facilities at Rajgrodzka Street in Augustów, which includes:

• Full-size room, among others, handball with a complex of locker rooms, bathrooms,

• outdoor multi-purpose pitch,

• external bleachers.

Facility 1C: Reconstruction of the football field with an athletics treadmill in Augustów, which includes:

• Redevelopment of the football field with an athletics treadmill,

• bleachers,

• new locker room building,

• club building,

• full-size training ground made of artificial grass,

• ORLIK football field

• multipurpose pitch,

• Tennis courts.

3.1. Description of the subject of task 1 - Annex No 3a

4. In accordance with the rules concerning the terms of payment of remuneration set out in the detailed rules and the mode of funding from the Government Fund of Polish Governance: Strategic Investment Programme annexed to Resolution No 84/2021 of the Council of Ministers of 1 July 2021, Preliminary Promesa concerning the financing of investments from the Government Fund of Poland Ład: Strategic Investment Programme No 01/2021/2453/PolskiLad of 17 November 2021. The Contractor shall provide financing of the task in a part not covered by the Contracting Authority's own participation, for the time preceding the payment from the Promesa, on the basis of the rules set out in § 3 (4) of the model contract.

5. All works must be carried out in accordance with technical documentation and applicable technical conditions and regulations.

6. The Contractor is obliged to provide the necessary personnel with appropriate building powers, enabling the work necessary for the proper performance of the task. The above staff the Contractor is obliged to declare for acceptance to the Contracting Party.

7. The object of the works attached to this SWZ is solely an auxiliary document which the Contractor may use but does not have such obligation.

The Contractor to whom the contract for the task/tasks described in paragraph 2 will submit a detailed offer cost estimate at the latest on the date of signing the contract. The detailed quotation will be an auxiliary material of the Contractor and the Contracting Authority enabling: determination of the type and quantity of works performed and received.

The Contractor should report any errors, missteps, discrepancies in the project documentation during the tender proceedings and request an explanation from the Contracting Authority. Investigation by the Contractor within a later date of claims for non-compliance between the real state and the condition specified in the design documentation will not be possible and the effects thereof will be charged by the Contractor of Works.

8. All works shall be carried out in a way that enables the operation of educational facilities during the school year, in case of need to exclude the object or part of the facility from use the Contractor shall be obliged to obtain the consent of the Contracting Authority the area of conducting works must be tightly bulk and protect against access to unauthorized persons. Particular attention should be paid when carrying out demolition, construction and construction works, in order to reduce the risk of danger, the works should be carried out in direct agreement with the school user and the Supervisory Supervisor, in such a way as to prevent appearance in the school of bystanders.

9. Pursuant to Article 101 (4) of the Pzp Act, where the subject of the contract is described by means of standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority shall allow solutions equivalent to those described. Furthermore, it should be assumed that all such references are accompanied by the words”

Construction of a bitumen pumptrack at the municipal skatepark in Augustów

Construction of a bitumen pumptrack at the municipal skatepark in Augustów.

3.2. Description of the subject of task order 2 - Annex No 3b

4. In accordance with the rules concerning the terms of payment of remuneration set out in the detailed rules and the mode of funding from the Government Fund of Polish Governance: Strategic Investment Programme annexed to Resolution No 84/2021 of the Council of Ministers of 1 July 2021, Preliminary Promesa concerning the financing of investments from the Government Fund of Poland Ład: Strategic Investment Programme No 01/2021/2453/PolskiLad of 17 November 2021. The Contractor shall provide financing of the task in a part not covered by the Contracting Authority's own participation, for the time preceding the payment from the Promesa, on the basis of the rules set out in § 3 (4) of the model contract.

5. All works must be carried out in accordance with technical documentation and applicable technical conditions and regulations.

6. The Contractor is obliged to provide the necessary personnel with appropriate building powers, enabling the work necessary for the proper performance of the task. The above staff the Contractor is obliged to declare for acceptance to the Contracting Party.

7. The object of the works attached to this SWZ is solely an auxiliary document which the Contractor may use but does not have such obligation.

The Contractor to whom the contract for the task/tasks described in paragraph 2 will submit a detailed offer cost estimate at the latest on the date of signing the contract. The detailed quotation will be an auxiliary material of the Contractor and the Contracting Authority enabling: determination of the type and quantity of works performed and received.

The Contractor should report any errors, missteps, discrepancies in the project documentation during the tender proceedings and request an explanation from the Contracting Authority. Investigation by the Contractor within a later date of claims for non-compliance between the real state and the condition specified in the design documentation will not be possible and the effects thereof will be charged by the Contractor of Works.

8. All works shall be carried out in a way that enables the operation of educational facilities during the school year, in case of need to exclude the object or part of the facility from use the Contractor shall be obliged to obtain the consent of the Contracting Authority the area of conducting works must be tightly bulk and protect against access to unauthorized persons. Particular attention should be paid when carrying out demolition, construction and construction works, in order to reduce the risk of danger, the works should be carried out in direct agreement with the school user and the Supervisory Supervisor, in such a way as to prevent appearance in the school of bystanders.

9. Pursuant to Article 101 (4) of the Pzp Act, where the subject of the contract is described by means of standards, technical assessments, technical specifications and technical reference systems, the Contracting Authority shall allow solutions equivalent to those described. Furthermore, it should be assumed that all such references are accompanied by the words 'or equivalent'. The indication of the equivalence of the solution offered in accordance with Article 101 (5) of the Pzp Act and on the principles specified therein shall be with the Contractor. In the case of description by means of standards, equivalent solutions shall be considered as equivalent solutions that ensure that the minimum requirements set out in the standard are met at a level no worse than described in the relevant standards. In the case of the standards cited in SWZ (if this is not specified in detail), current standards are understood. In other cases (description of the subject of the contract using technical assessments, technical specifications and technical reference systems), such product, material or system with technical, functional and quality parameters not inferior to those mentioned in description of the object of the order.

10. Whenever in this SWZ the subject of the order was determined by the indication of trademarks, patents,

Construction of an outdoor gym and recreation area for the little ones on the Netta River in Augustów

Construction of an outdoor gym and recreation area for the little ones on the Netta River in Augustów. Description of the subject of task order 3 - Annex No 3c

4. In accordance with the rules concerning the terms of payment of remuneration set out in the detailed rules and the mode of funding from the Government Fund of Polish Governance: Strategic Investment Programme annexed to Resolution No 84/2021 of the Council of Ministers of 1 July 2021, Preliminary Promesa concerning the financing of investments from the Government Fund of Poland Ład: Strategic Investment Programme No 01/2021/2453/PolskiLad of 17 November 2021. The Contractor shall provide financing of the task in a part not covered by the Contracting Authority's own participation, for the time preceding the payment from the Promesa, on the basis of the rules set out in § 3 (4) of the model contract.

5. All works must be carried out in accordance with technical documentation and applicable technical conditions and regulations.

6. The Contractor is obliged to provide the necessary personnel with appropriate building powers, enabling the work necessary for the proper performance of the task. The above staff the Contractor is obliged to declare for acceptance to the Contracting Party.

7. The object of the works attached to this SWZ is solely an auxiliary document which the Contractor may use but does not have such obligation.

The Contractor to whom the contract for the task/tasks described in paragraph 2 will submit a detailed offer cost estimate at the latest on the date of signing the contract. The detailed quotation will be an auxiliary material of the Contractor and the Contracting Authority enabling: determination of the type and quantity of works performed and received.

The Contractor should report any errors, missteps, discrepancies in the project documentation during the tender proceedings and request an explanation from the Contracting Authority. Investigation by the Contractor within a later date of claims for non-compliance between the real state and the condition specified in the design documentation will not be possible and the effects thereof will be charged by the Contractor of Works.

8. All works shall be carried out in a way that enables the operation of educational facilities during the school year, in case of need to exclude the object or part of the facility from use the Contractor shall be obliged to obtain the consent of the Contracting Authority the area of conducting works must be tightly bulk and protect against access to unauthorized persons. Particular attention should be paid when carrying out demolition, construction and construction works, in order to reduce the risk of danger, the works should be carried out in direct agreement with the school user and the Supervisory Supervisor, in such a way as to prevent In accordance with Article 101 (4) of the Law of Pzp, where the subject of the contract is described by means of standards, technical evaluations, technical specifications and technical reference systems, the Ordering Party shall allow solutions equivalent to the described. Furthermore, it should be assumed that all such references are accompanied by the words 'or equivalent'. The indication of the equivalence of the solution offered in accordance with Article 101 (5) of the Pzp Act and on the principles specified therein shall be with the Contractor. In the case of description by means of standards, equivalent solutions shall be considered as equivalent solutions that ensure that the minimum requirements set out in the standard are met at a level no worse than described in the relevant standards. In the case of the standards cited in SWZ (if this is not specified in detail), current standards are understood. In other cases (description of the subject of the contract using technical assessments, technical specifications and technical reference systems), such product, material or system with technical, functional and quality parameters not inferior to those mentioned in description of the object of the order.

Download full details as .pdf
The Buyer:
Gmina Miasto Augustów
CPV Code(s):
39293300 - Artificial grass
45000000 - Construction work
45100000 - Site preparation work
45110000 - Building demolition and wrecking work and earthmoving work
45111200 - Site preparation and clearance work
45111291 - Site-development work
45112712 - Landscaping work for gardens
45112720 - Landscaping work for sports grounds and recreational areas
45210000 - Building construction work
45212000 - Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
45212222 - Gymnasium construction work
45212224 - Stadium construction work
45220000 - Engineering works and construction works
45223000 - Structures construction work
45230000 - Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45232150 - Works related to water-distribution pipelines
45233200 - Various surface works
45233300 - Foundation work for highways, roads, streets and footpaths
45236112 - Flatwork for tennis court
45261000 - Erection and related works of roof frames and coverings
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45314320 - Installation of computer cabling
45331100 - Central-heating installation work
45331200 - Ventilation and air-conditioning installation work
45332300 - Drain-laying work
45400000 - Building completion work
45432112 - Laying of paving
45450000 - Other building completion work