4-storey extension to existing hospital as main measure
and conversion measures in the existing ground floor up to 3rd floor -
as well as preliminary measures with construction of external stairs and emergency exits
and interim relocation of the existing main entrance
GLT
Hygiene flushing
HVAC Monitoring Radiology/ Laboratory Area
Nursing wards