Extension of the Gymnasium Höchstadt a. d. Aisch
4-storey new extension building with 20 classrooms, specialist rooms for physics as well as learning landscapes, ancillary and technical rooms.
Hybrid construction in reinforced concrete and wood.
Extension of the Gymnasium Höchstadt a. d. Aisch - Insulation work on technical installations
-approx. 565 m insulation cold water pipes stainless steel 15 x 1 – 42 x 1.5
-approx. 1350 m insulation heating pipes black steel pipe DN 15 – DN 65
-approx. 120 pieces of insulation, built-in parts, heating installation
-approx. 1800 m² insulation ventilation ducts straight and shape with aluminium-laminated mineral wool
-approx. 950 m² insulation ventilation ducts straight and shape with closed-cell flexible foam