Grade-separated junction construction work | Tenderlake

Grade-separated junction construction work

Contract Value:
EUR 24M - 24M
Notice Type:
Contract Notice
Published Date:
22 December 2023
Closing Date:
20 February 2024
Location(s):
ITG12 Palermo (IT Italy/ITALIA)
Description:
Construction works of the Castronovo di Sicilia junction including detailed design, with multiple categories of work and subcontracting options, for a total amount of €18,589,524.94.
PA 59/23

S.S. n. 189 "Della Valle dei Platani" – Construction works of the Castronovo di Sicilia junction. Detailed design.

CUP code: F61B23000130001

PREVAILING CATEGORY

OG3 (roads, motorways, bridges, viaducts, railways, tramways, subways, funiculars and airport runways, and related complementary works) amount: € 18,589,524.94, Classification VII, subject to use - subcontractable to the extent (maximum) of 50%, pursuant to art. 119 paragraphs 1 and 2 of the Code

Classification VII with reference to the entire amount of the contract.

Uncoverable categories

OG10 (plants for the transformation of high/medium voltage and for the distribution of electricity in alternating and direct current) amount: € 1,261,987.52, Classification III bis, separable from mandatory qualification - subject to use - entirely subcontractable, pursuant to art. 119, paragraph 2, of the Code.

OG 13 (Naturalistic engineering works) amount: € 223,155.42, Classification I, separable with mandatory qualification – entirely subcontractable, pursuant to art. 119, paragraph 2, of the Code.

OS11 (special structural equipment) amount: € 458,327.54, Classification II, separable with mandatory qualification – fully subcontractable, pursuant to art. 119, paragraph 2, of the Code.

OS12-A (road safety barriers) amount: € 2,461,079.60, Classification IV, separable with mandatory qualification – fully subcontractable, pursuant to art. 119, paragraph 2, of the Code.

OS18-A (structural steel components) amount: € 507,109.06 , Classification II, separable with mandatory qualification – fully subcontractable pursuant to art. 119, paragraph 2, of the Code.

(All amounts are inclusive of labor costs and security charges.)

Pursuant to Article 119, paragraph 17, all categories of work covered by this contract may be subcontracted but cannot, in turn, be subject to further subcontracting (so-called cascade subcontracting). This is due to the need to strengthen the control of site activities and more generally of the workplace and to ensure more intense protection of working conditions and the health and safety of workers.

Nature and extent of performance

Amount € 12,591,894.46

Amount €10,066,850.30

Security charges Amount € 842,439.32

The amount of custody cannot be lowered

Labour Costs Amount € 3,024,983.81

Security charges Amount € 842,439.32

Download full details as .pdf
The Buyer:
ANAS S.p.A.
CPV Code(s):
45233126 - Grade-separated junction construction work