Stadium construction work

Contract Value:
EUR 5M - 5M
Notice Type:
Contract Notice
Published Date:
05 May 2021
Closing Date:
07 June 2021
Location(s):
FRI12 Gironde (FR FRANCE)
Description:
Creation of a football complex at Parc du Loret in Cenon

The procurement procedure used is: the open invitation to tender. It is subject to the provisions of articles L. 2124-2, R. 2124-2 1º and R. 2161-2 to R. 2161-5 of the public procurement code.

This consultation concerns:

Creation of a football complex at par du Loret in Cenon — it consists of sixteen lots.

The project includes the creation of two football fields in synthetic surface, half grass terrain, the construction of a sports pole building, a technical pole building, access roads and car parks.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code.

— the work will be carried out in co-activity;

— companies will be forced to work in the summer period.

Earthworks - VRD - green spaces

Earthworks — HRD — green spaces.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP. Compliance with these provisions is a condition of the conformity of the offer.

For lots 1, 2 and 3, the judgment of tenders shall incorporate, in the context of weighting the selection criteria, a measure of the quality of execution of the insertion clause based on:

— the number of additional insertion hours proposed by the candidate (four points);

— technical support (six points);

— socio-professional support (six points);

— the rise in skill and training (four points).

Drywall

Work on laying drywall.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Interior wood carpentry — false ceiling

Laying work of interior wood carpentry and false ceilings.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Tiles - earthenware

Work on laying tiles and earthenware.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Painting - flooring

Painting work and laying floor coverings.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

Elevator

Installation work of an elevator.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

Electricity strong and weak currents

Strong and weak electrical work.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Heating - ventilation - plumbing - sanitary

Heating - ventilation - plumbing - sanitary.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Sports floors — furniture — fences — balloon screens

Works and equipment: sports floors — furniture — fences — balloon screens.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP. Compliance with these provisions is a condition of the conformity of the offer.

For lots 1, 2 and 3, the judgment of tenders shall incorporate, in the context of weighting the selection criteria, a measure of the quality of the execution of the insertion clause based on:

— the number of additional insertion hours proposed by the candidate (four points);

— technical support (six points);

— socio-professional support (six points);

— the rise in skill and training (four points).

Big work

Structural work

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP. Compliance with these provisions is a condition of the conformity of the offer.

For lots 1, 2 and 3, the judgment of tenders shall incorporate, in the context of weighting the selection criteria, a measure of the quality of the execution of the insertion clause based on:

— the number of additional insertion hours proposed by the candidate (four points);

— technical support (six points);

— socio-professional support (six points);

— the rise in skill and training (four points).

Metal frame

Metal frame work.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Blanket

Roof works.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

sealing

Sealing work.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

Wood siding

Wood cladding work.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Aluminum exterior carpentry

Carpentry work.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022. This consultation includes conditions of execution of a social nature, according to Articles L. 2112-2 and L. 2152-7 of the new public order code, the details of which are indicated in the CCAP.

Locksmithing and stands seats

Locksmithing work and installation of stands seats.

The overall maximum time limit for the completion of the work is 12 months including the summer period, with a mandatory delivery deadline at the end of July 2022.

Download full details as .pdf
The Buyer:
Commune de Cenon
CPV Code(s):
39110000 - Seats, chairs and related products, and associated parts
39293400 - Artificial lawn
44316500 - Smiths' wares
45112500 - Earthmoving work
45212221 - Construction work in connection with structures for sports ground
45212224 - Stadium construction work
45223220 - Structural shell work
45260000 - Roof works and other special trade construction works
45261100 - Roof-framing work
45261210 - Roof-covering work
45262650 - Cladding works
45311000 - Electrical wiring and fitting work
45313100 - Lift installation work
45315000 - Electrical installation work of heating and other electrical building-equipment
45331000 - Heating, ventilation and air-conditioning installation work
45421000 - Joinery work
45421146 - Installation of suspended ceilings
45421150 - Non-metal joinery installation work
45421152 - Installation of partition walls
45431000 - Tiling work
45432100 - Floor laying and covering work
45442110 - Painting work of buildings