The subject of the Contract is: Reconstruction of the "A" main line on the section from the A-12A heating chamber to the A-24 chamber - stage I and II in the area of Rembielińska/Kondratowicza Street (SC III 8) - the section from the A-12A chamber up to and including the connection to the heating network in front of the A-13 chamber.
as part of the task: Reconstruction of 3 260 m of district heating network in Warsaw
as part of the project: "Modernization of the Warsaw district heating network in the Capital City of Warsaw in order to reduce carbon dioxide emissions and improve energy efficiency - Stage III" POIS.01.05.00-00-0025/18;
Under the Operational Programme Infrastructure and Environment 2014-2020, Priority Axis I Reducing the emissivity of the economy, Action 1.5 Effective distribution of heat and cold.
A detailed description of the subject of the contract includes:
1. project documentation and formal and legal documentation,
2. technical specifications for the performance and reception of construction works
- forming part III of SWZ.
The subject of the Contract is: Reconstruction of the "A" main line on the section from the A-12A heating chamber to the A-24 chamber - stage I and II in the area of Rembielińska/Kondratowicza Street (SC III 8) - the section from the A-12A chamber up to and including the connection to the heating network in front of the A-13 chamber.
as part of the task: Reconstruction of 3 260 m of district heating network in Warsaw
as part of the project: "Modernization of the Warsaw district heating network in the Capital City of Warsaw in order to reduce carbon dioxide emissions and improve energy efficiency - Stage III" POIS.01.05.00-00-0025/18;
Under the Operational Programme Infrastructure and Environment 2014-2020, Priority Axis I Reducing the emissivity of the economy, Action 1.5 Effective distribution of heat and cold.
A detailed description of the subject of the contract includes:
1. project documentation and formal and legal documentation,
2. technical specifications for the performance and reception of construction works
- forming part III of SWZ.