Description:
Make doc. design for Mon: App. to transmission network EC Czechnica in Siechnice as part of the building connections and gas. serving for to transmission system gas. entities along with the infrastructure necessary to service them

1. The subject of the Order is the preparation of project documentation for the task: "Connection to the EC Czechnica transmission network in Siechnice as part of the construction of connections and gas. used to connect to the gas transmission system entities connected together with the infrastructure necessary to operate them "

The investment is covered by the Act of 24.4.2009 on investments in the liquefied natural gas regasification terminal in Świnoujście, hereinafter referred to as Specustawa (Journal of Laws 2017.2302, as amended).

2. A detailed description of the subject of the Order is included in Annexes 1 to the ToR - Draft Agreement.

3. CPV code number of the subject of the Order:

- 71242000-6.

1. The subject of the Order is the preparation of project documentation for the task: "Connection to the EC Czechnica transmission network in Siechnice as part of the construction of connections and gas. used to connect to the gas transmission system entities connected together with the infrastructure necessary to operate them "

The investment is covered by the Act of 24.4.2009 on investments in the liquefied natural gas regasification terminal in Świnoujście, hereinafter referred to as Specustawa (Journal of Laws 2017.2302, as amended).

2. A detailed description of the subject of the Order is included in Annexes 1 to the ToR - Draft Agreement.

3. CPV code number of the subject of the Order:

- 71242000-6.

4. Where the content of the Specification and the Annexes to the Specification contains a reference to a specific type of standard, the Employer allows equivalent standards. The Contractor who, in order to demonstrate that the offered subject of the Order meets the requirements of the Order, refers to equivalent solutions described by the Employer, is obliged to demonstrate that the subject of the Contract offered by him meets the requirements specified by the Employer.

5. The Awarding Entity allows the possibility of making a site visit by Contractors, not later than 3 days before the deadline for submission of tenders. In such a situation, the Contractor is obliged, at least 2 days before the date of the site visit proposed by him, to use electronic means of communication within the meaning of the Act of 18.7.2002 on the provision of electronic services (i.e. item 1219; hereinafter referred to as the "Act on the provision of electronic services") to the Ordering Party with a request to set the date (day and time) of making a local visit, with the proviso that the local visit may take place from Monday to Friday, excluding public holidays from work in 9: 00-14: 00.

6. The Contractor is obliged to read and apply the recommendations arising from the Code of Conduct for Suppliers of the Gas Transmission Operator Gaz-System SA (The Code of Conduct for Suppliers of the Gas Transmission Operator Gaz-System SA is available on the website of the Employer: http: //www.gaz -system.pl/przetargi/kodeks-postepowania-dla-dostawcow/).

7. The Contractor is obliged to read and apply the Regulations of the eB2B Purchasing Platform, available on the website: https://gazsys-tem.eb2b.com.pl/cms/page/id/terms-and-conditions/.

Download full details as .pdf
The Buyer:
Operator Gazociągów Przesyłowych Gaz-System S.A., ul. Mszczonowska 4, 02-337 Warszawa, Operator Gazociągów Przesyłowych Gaz-System S.A., Oddział we Wrocławiu
CPV Code(s):
71242000 - Project and design preparation, estimation of costs