Borromäus Hospital Leer, Trade Outdoor Facilities - Civil Engineering and Landscaping Work, Part 1
The construction project includes the construction of the outdoor facilities south and west of the new building.
Supply and install 2 pcs of seepage and restraint system (total storage volume 120 m³)
Supply and install 3 pc shafts DN 1000 made of polyethylene
Accommodate 1,300 m² of old pavement, of which 550 m² palletize for reinstallation and temporarily store on site
1,285 m² paving surfaces
Supply and install 10 pc bollards (without electrical installation)
Supply and install 1 pc pole luminaire (without electrical installation)
2 pc benches deliver and assemble
1 pc waste container supply and assembly
419 m² planting areas (shrubs, groundcover roses and perennials) production incl. delivery, planting, care