University of Bamberg - Sports Hall
23E0197 Roofing work
with maintenance of the SHEV systems Smoke evacuation staircase / sports hall
Roof work with maintenance of the SHEV systems Smoke evacuation staircase / sports hall
- approx. 2.350m2 demolition waterproofing bitumen membrane flat roof
- approx. 2.350m2 demolition of roof formwork wood flat roof
- approx. 2.250m2 vapour barrier bitumen membrane flat roof
- 2 St Rauchableitöffnung
- 1 St Flachdachausstieg
- 8 pcs flat roof drain with gravel trap
- approx. 275m attic cover aluminium
- 2 pcs stop construction for rope safety
- approx. 2,250m2 slope insulation flat roof
- approx. 2.250m2 roof waterproofing bitumen flat roof
- approx. 30m2 demolition of reinforced concrete ceiling
- approx. 30m3 in-situ concrete attic
- approx. 4.5t reinforcing bars B500B attic
- ca. 1.400m2 Brettschichtholzdecke, D=60mm
- 16 pcs flat roof quick run-off
- approx. 70m façade gutter steel
- approx. 1.1t upgrading of lower belt and assembly joint, small iron parts
- 1psch Upgrading pull rods with corrosion protection
- approx. 120t disposal of waste polluted, bitumen PAH
- approx. 30t disposal of waste polluted, KMF