The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library will be installed on the ground floor and basement.
The best. The roof truss and the wooden beam ceilings on the 2nd floor, 1st floor and ground floor are completely removed.
In some areas, a new reinforced concrete ceiling is installed above the basement, first floor and upper floor. The outer walls are reinforced by reinforced concrete columns from the ground floor to the roof.
A new building is being built in the basement. Rooms for music associations are created on the east side. Toilet facilities and shooting ranges with adjoining rooms are located in the north.
All ventilation and heating technology is installed in the west.
Ground floor: Rooms for the adult education center are planned in the north-west. Access is via the south side with an information entrance hall.
An information hall is planned in the south-east. Upper floor: Side rooms, changing rooms and cloakrooms are planned for the hall on the north side.
Core quantities:
- approx. 500 m
- approx. 230 m
- approx. 1 700 m
- approx. 1 685 m
- approx. 1,960 m