Lot 20 - Gala
Total surface to be produced of approx. 3 850 m
Floor work and profiling; Loosen soil and dispose of 500 m³; Load and dispose of the floor 910 m³; Loosen and reinstall the floor 300 m³; Deliver and install floor 150 m³; Antifreeze and base courses 525 m³; Accessible areas of concrete slab covering 200 m
Surrounds from 360 meters deep and steel strap 400 m; Dismantling sidewalk crossings and rebuilding an access road; 9 wall installations with a total of approx. 150 angle brackets; 5 staircases with a total of 30 steps,
Railings and handrails box channels 42.5 m, facade channels 22.4 m; Yard / street procedures 20 pieces, gratings 9 pieces; Rainwater underground pipes, pit 25 pieces, 4 rainwater retention basins with respective inlet and outlet shaft (with throttling function) Mast lights 7 pieces, bollard lights 6 pieces incl. Cable laying; Equipment including 3 benches, 3 signage, 1 bollard, 9 letterboxes; Greenery incl. Topsoil: lawns 2 250 m