Finsing Primary and Middle School; Extension of the west wing
VE 402 - Sanitärarbeiten
Sanitary work:
- Waste water pipes in the building: PP pipe DN50-DN100: approx. 300m
(including insulation and fire protection measures)
- Pipes stainless steel, DN12-42 approx. 250m (including insulation measures and
Fire protection measures)
- Metal composite pipe DN12 – DN25 approx. 350m (including insulation measures)
- Sanitary fixtures (pre-wall installation in the UK):
o Wall-mounted flush-toilet: 19 pcs
o Washbasins: 28 pcs
o Urinals: 12 pcs.