Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warsaw (25 parts)

1. The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of RD Warsaw.

Usł.G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of the Implementation of the Usł.G., constituting Annex 1 to the contract;

• loading Shipments onto the vehicle and their placement in the vehicle;

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of implementation of the Usł.G.

2.A detailed description of the implementation of the service. G contains the Schedule for the implementation of the usł. G - Annex 1 to the model contract - respectively for each of the parts.

3. Detailed rules for the implementation of the subject of the contract are specified in the model contract - Annex 3 to SWZ.

4.The subject of the order has been divided into 25 parts.

5. The Ordering Party does not provide:

- the holding of an electronic auction,

- convening a meeting of Contractors.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 1

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Annex 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/480; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 63 km; total number of circuits for the procedure 355; maximum number of km (with option right): 22 365 km (including the number of km covered by the basic contract (80%) 17 892; the number of km covered by the option right (20 %) 4473).

3. Based on the experience of the Ordering Party, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 17 199 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance, within the meaning of the Act of 26.06.1974 - Labour Code (Journal of Laws of 2020, item 1320).

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety.

9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388(2)(c) of the PPL, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/480; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 63 km; total number of circuits for the procedure 127; maximum number of km (with option right): 8 001 km (including the number of km covered by the basic contract (80%) 6 401; the number of km covered by the option right (20 %) 1600).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 10

1.All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Annex 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2265, 10/3303; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation is 88 km; total number of circuits for the procedure 355; maximum number of km (with option right): 31 240 km (including the number of km covered by the basic contract (80%) 24 992; the number of km covered by the option right (20 %) 6 248).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 24 024 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2265, 10/3303; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation is 88 km; total number of circuits for the procedure 127; maximum number of km (with option right): 11 176 km (including the number of km covered by the basic contract (80%) 8 941; the number of km covered by the option right (20 %) 2 235).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 11

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2270, 10/3332; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation is 81 km; total number of circuits for the procedure 355; maximum number of km (with option right): 28 755 km (including the number of km covered by the basic contract (80%) 23 004; the number of km covered by the option right (20 %) 5 751).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 22113 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code (Journal of Laws of 2020, item 1320).

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2270, 10/3332; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation is 81 km; total number of circuits for the procedure 127; maximum number of km (with option right): 10 287 km (including the number of km covered by the basic contract (80%) 8 230; the number of km covered by the option right (20%) 2 057).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 12

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2266, 10/3319; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 108 km; total number of circuits for the procedure 355; maximum number of km (with option right): 38 340 km (including the number of km covered by the basic contract (80%) 30672; the number of km covered by the option right (20 %) 7668).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the service of the Service G exceeds: 29484 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship, within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2266, 10/3319; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 108 km; total number of circuits for the procedure 127; maximum number of km (with option right): 13 716 km (including the number of km covered by the basic contract (80%) 10 973; the number of km covered by the option right (20 %) 2 743).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 13

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/412; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation is 81 km; total number of circuits for the procedure 355; maximum number of km (with option right): 28755 km (including the number of km covered by the basic contract (80%) 23004; the number of km covered by the option right (20%) 5751).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 22 113 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/412; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation is 81 km; total number of circuits for the procedure 127; maximum number of km (with option right): 10 287 km (including the number of km covered by the basic contract (80%) 8 230; the number of km covered by the option right (20%) 2 057).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 14

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/445, 10/459; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 167 km; total number of circuits for the procedure 355; maximum number of km (with option right): 59 285 km (including the number of km covered by the basic contract (80%) 47 428; the number of km covered by the option right (20 %) 11 857).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 45 591 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388(2)(c) of the PPL, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/445, 10/459; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 167 km; total number of circuits for the procedure 127; maximum number of km (with option right): 21 209 km (including the number of km covered by the basic contract (80%) 16 967; the number of km covered by the option right (20%) 4 242).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 15

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/423; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 144 km; the total number of circuits for the procedure 72; maximum number of km (with option right): 10368 km (including the number of km covered by the basic contract (80%) 8294; the number of km covered by the option right (20%) 2074).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 7776 km.

7. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

8. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship, within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety.

9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/423; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 144 km; total number of circuits for the procedure 26; maximum number of km (with option right): 3 744 km (including the number of km covered by the basic contract (80%) 2 995; the number of km covered by the so-called option right (20%) 749).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 16

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/454; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 89 km; the total number of circuits for the procedure 72; maximum number of km (with option right): 6408 km (including the number of km covered by the basic contract (80%) 5126; the number of km covered by the option right (20%) 1282).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 4806 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance, within the meaning of the Act of 26.06.1974 - Labour Code (Journal of Laws of 2020, item 1320).

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/454; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 89 km; total number of circuits for the procedure 26; maximum number of km (with option right): 2 314 km (including the number of km covered by the basic contract (80%) 1 851; the number of km covered by the so-called option right (20%) 463).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 17

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/451, 10/406; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 136 km; total number of circuits for the procedure 355; maximum number of km (with option right): 48 280 km (of which the number of km covered by the basic contract (80 %) 38 624; the number of km covered by the option right (20 %) 9656).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 37128 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/451, 10/406; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 136 km; total number of circuits for the procedure 127; maximum number of km (with option right): 17 272 km (including the number of km covered by the basic contract (80%) 13 818; the number of km covered by the option right (20 %) 3 454).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 18

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/401; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 105 km; the total number of circuits for the procedure 72; maximum number of km (with option right): 7560 km (including the number of km covered by the basic contract (80%) 6048; the number of km covered by the option right (20%) 1512).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 5 670 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/401; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 105 km; total number of circuits for the procedure 26; maximum number of km (with option right): 2 730 km (including the number of km covered by the basic contract (80%) 2 184; the number of km covered by the option right (20%) 546).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 19

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/417, 10/433; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 175 km; total number of circuits for the procedure 355; maximum number of km (with option right): 62 125 km (including the number of km covered by the basic contract (80%) 49 700; the number of km covered by the option right (20 %) 12 425).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of the G Service exceeds: 47 775 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/417, 10/433; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 175 km; total number of circuits for the procedure 127; maximum number of km (with option right): 22 225 km (including the number of km covered by the basic contract (80%) 17 780; the number of km covered by the option right (20 %) 4 445).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 2

1.All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Annex 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2272, 10/2285; vehicle category Ib from 1,3 to 3,5 tonnes; on Monday, Wednesday and Friday the length of the route in circulation is 99 km; the total number of circuits for the proceedings 212 and on Tuesdays and Thursdays the length of the route in circulation is 106 km; total number of circuits for the procedure 143; maximum number of km (with option right): 36146 km (including the number of km covered by the basic contract (80%) 28 917; the number of km covered by the option right (20%) 7 229).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 27797 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety.

9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388(2)(c) of the PPL, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called usł. G) in the area of operation of RD Wwa. Usł.G – consists in transporting Shipments (including those containing Postal Items), under which the Contractor is obliged to: • accept Shipments for carriage in places and dates specified in the Schedule of Usł.G - 1 to the contract; • loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of Implementation of usł.G - annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2272, 10/2285; vehicle category Ib from 1,3 to 3,5 tonnes; on Monday, Wednesday and Friday the length of the route in circulation is 99 km; the total number of circuits for the proceedings 76 and on Tuesdays and Thursdays the length of the route in circulation 106 km, the total number of circuits for the proceedings 51; maximum number of km (with option right): 12 930 km (including the number of km covered by the basic contract (80%) 10 344; the number of km covered by the option right (20 %) 2 586).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on the experience possessed, it is estimated that for proper implementation it is necessary to have at least 1 car.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 20

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/419, 10/474; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 212 km; total number of circuits for the procedure 355; maximum number of km (with option right): 75 260 km (including the number of km covered by the basic contract (80%) 60 208; the number of km covered by the option right (20 %) 15 052).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 57 876 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/419, 10/474; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 212 km; total number of circuits for the procedure 127; maximum number of km (with option right): 26 924 km (including the number of km covered by the basic contract (80%) 21 539; the number of km covered by the option right (20 %) 5 385).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 21

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/474A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 120 km; total number of circuits for proceedings 427; maximum number of km (with option right): 51 240 km (including the number of km covered by the basic contract (80%) 40 992; the number of km covered by the option right (20%) 10 248).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 39 240 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/474A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 120 km; the total number of circuits for the proceedings 153; maximum number of km (with option right): 18 360 km (including the number of km covered by the basic contract (80%) 14 688; the number of km covered by the option right (20 %) 3 672).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 22

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2220, 10/2220A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation on Mondays 36 km; the total number of circuits is 68 and from Tuesday to Friday 33 km; total number of circuits 287; maximum number of km (with option right): 11 919 km (including the number of km covered by the basic contract (80%) 9535; the number of km covered by the option right (20%) 2384).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of the G Service exceeds: 9165 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Wwa. Usł.G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of implementation of the Usł.G., constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of the Usł.G., constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2220, 10/2220A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation on Mondays 36 km; the total number of circuits 26 and from Tuesday to Friday 33 km; total number of circuits 101; maximum number of km (with option right): 4269 km (including the number of km covered by the basic contract (80%) 3 415; the number of km covered by the option right (20 %) 854).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 23

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/434A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation is 66 km; total number of circuits for the procedure 355; maximum number of km (with option right): 23430 km (including the number of km covered by the basic contract (80%) 18744; the number of km covered by the option right (20%) 4686).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of the G Service exceeds: 18018 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for course No. 10/434A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation is 66 km; total number of circuits for the procedure 127; maximum number of km (with option right): 8 382 km (including the number of km covered by the basic contract (80%) 6 706; the number of km covered by the option right (20 %) 1 676).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 24

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2225, 10/413; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 86 km; total number of circuits for the procedure 355; maximum number of km (with option right): 30 530 km (including the number of km covered by the basic contract (80%) 24424; the number of km covered by the option right (20 %) 6106).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 23 478 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2225, 10/413; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 86 km; total number of circuits for the procedure 127; maximum number of km (with option right): 10 922 km (including the number of km covered by the basic contract (80%) 8 738; the number of km covered by the option right (20%) 2 184).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 25

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/413A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 94 km; total number of circuits for proceedings 427; maximum number of km (with option right): 40 138 km (including the number of km covered by the basic contract (80%) 32 110; the number of km covered by the option right (20%) 8 028).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 30 738 kim.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance, within the meaning of the Act of 26.06.1974 - Labour Code (Journal of Laws of 2020, item 1320).

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/413A; vehicle category II from 3.51 to 8.0 tons, necessary elevator + side doors; the length of the route in circulation 94 km; the total number of circuits for the proceedings 153; maximum number of km (with option right): 14 382 km (including the number of km covered by the basic contract (80%) 11 506; the number of km covered by the option right (20%) 2 876).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 3

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2273, 10/3340; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 74 km; total number of circuits for the procedure 355; maximum number of km (with option right): 26 270 km (including the number of km covered by the basic contract (80%) 21016; the number of km covered by the option right (20%) 5254).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of service G exceeds: 20202 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

7.The Contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in full.

8.The Contracting Authority provides for the possibility of awarding the existing Contractor of services, in the form of a direct contract pursuant to Article 388 point 2) letter c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2273, 10/3340; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 74 km; total number of circuits for the procedure 127; maximum number of km (with option right): 9 398 km (including the number of km covered by the basic contract (80%) 7 518; the number of km covered by the option right (20%) 1 880).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warsaw (25 parts) - part 4

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2253, 10/3300; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 122 km; total number of circuits for the procedure 355; maximum number of km (with option right): 43 310 km (including the number of km covered by the basic contract (80%) 34 648; the number of km covered by the option right (20 %) 8662).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the service of the Service G exceeds: 33306 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7.Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority does not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the field of contract performance on the basis of an employment relationship, within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety.

9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2) letter c) of the Public Procurement Law, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2253, 10/3300; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 122 km; total number of circuits for the procedure 127; maximum number of km (with option right): 15 494 km (of which the number of km covered by the basic contract (80%) 12 395; the number of km covered by the option right (20 %) 3 099).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 5

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Annex 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/3358,10/3348; vehicle category Ib from 1,3 to 3,5 tonnes; on Monday, Wednesday and Friday the length of the route in circulation is 91 km; the total number of circuits for the proceedings 212 and on Tuesdays and Thursdays the length of the route in circulation 85 km; total number of circuits for the procedure 143; maximum number of km (with option right): 31447 km (including the number of km covered by the basic contract (80%) 25158; the number of km covered by the option right (20%) 6289).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the service of the Service G exceeds: 24183 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called usł. G) in the area of operation of RD W.wa. Usł.G – consists in transporting Shipments (including those containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in places and dates specified in the Schedule of Implementation of usł.G - annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of implementation of usł.G - annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/3358, 10/3348; vehicle category Ib from 1,3 to 3,5 tonnes; on Monday, Wednesday and Friday the length of the route in circulation is 91 km; the total number of circuits for the proceedings 76 and on Tuesdays and Thursdays the length of the route in circulation is 85 km; total number of circuits for the procedure 51; maximum number of km (with option right): 11251 km (including the number of km covered by the basic contract (80%) 9001; the number of km covered by the option right (20%) 2 250).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5. The obligations of the Parties shall be governed on a basis analogous to the contract concluded in the basic procurement procedure.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car.

Provision of transport services as part of the implementation of intra-node routes (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 6

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/2252, 10/2294; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 74 km; total number of circuits for the procedure 355; maximum number of km (with option right): 26270 km (including the number of km covered by the basic contract (80%) 21016; the number of km covered by the option right (20%) 5254).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the service of the Service G exceeds: 20 202 km

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.6.1974- Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of implementation of the Usł.G., constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of the Usł.G., constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/2252, 10/2294; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 74 km; total number of circuits for the procedure 127; maximum number of km (with option right): 9 398 km (including the number of km covered by the basic contract (80%) 7 518; the number of km covered by the option right (20%) 1 880).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 7

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/485; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 80 km; total number of circuits for the procedure 355; maximum number of km (with option right): 28 400 km (including the number of km covered by the basic contract (80%) 22720; the number of km covered by the option right (20%) 5680).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the Service G it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of the Usł.G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the service of the Usł.G exceeds: 21840 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship, within the meaning of the Act of 26.6.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety.

9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/485; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 80 km; total number of circuits for the procedure 127; maximum number of km (with option right): 10 160 km (including the number of km covered by the basic contract (80%) 8 128; the number of km covered by the option right (20 %) 2 032).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 8

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/483, 10/3331; vehicle category Ib from 1,3 to 3,5 tonnes; length of the route in circulation 77 km; total number of circuits for the procedure 355; maximum number of km (with option right): 27 335 km (including the number of km covered by the basic contract (80%) 21 868; the number of km covered by the option right (20%) 5 467).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of the G Service exceeds: 21 021 km.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or further subcontractor to employ persons performing activities in the scope of the contract performance on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388 point 2)(c) of the Public Procurement Law, consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/483, 10/3331; vehicle category Ib from 1,3 to 3,5 tonnes; length of the route in circulation 77 km; total number of circuits for the procedure 127; maximum number of km (with option right): 9 779 km (including the number of km covered by the basic contract (80%) 7 823; the number of km covered by the option right (20 %) 1 956).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded in the procedure for the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

Provision of transport services as part of the implementation of intra-node courses (so-called G services) in the area of operation of RD Warszawa (25 parts) - part 9

1. All cars intended by the Contractor for the implementation of the subject of the contract should meet the requirements in accordance with Appendix No. 2 to the model contract: Technical and functional parameters of vehicles.

2. Volume of kilometers for the basic order to be executed for the course No. 10/440, 10/3333; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 79 km; total number of circuits for the procedure 355; maximum number of km (with option right): 28 045 km (including the number of km covered by the basic contract (80%) 22436; the number of km covered by the option right (20%) 5609).

3. Based on its experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.

4. The Ordering Party's obligation to order the performance of Service G includes the basic order. The Ordering Party is entitled to extend the order to the extent covered by the right of option.

5. The Ordering Party may exercise the right of option if the total length of the courses performed by the Contractor within 13 months from the date of commencement of the provision of Service G exceeds: 21567.

6. The Ordering Party shall allow the possibility of submitting partial tenders. The contractor may submit a tender for one or more lots of the contract. Each of the partial contracts will be assessed separately, according to the criterion given in the SWZ.

7. Pursuant to Article 95(1) of the Public Procurement Law, the Contracting Authority shall not require the Contractor, subcontractor or sub-subcontractor to employ persons performing activities in the scope of the performance of the contract on the basis of an employment relationship within the meaning of the Act of 26.06.1974 - Labour Code.

8. The contractor may entrust the performance of part of the contract to a subcontractor, but may not entrust the subcontractor with the performance of the contract in its entirety. 9. The Contracting Authority provides for the possibility of awarding to the existing Contractor services, under the direct contract procedure pursuant to Article 388(2)(c) of the PPL Act, a contract consisting in the repetition of similar services, in accordance with the subject of the basic contract (up to 50% of the value of the services being the subject of the basic contract). The conditions under which the above-mentioned contract will be awarded directly:

1) The subject of the contract is the provision of transport services as part of the implementation of intra-node courses (the so-called G services) in the area of operation of RD Warsaw. Service G – consists in transporting Shipments (including Shipments containing Postal Items), under which the Contractor is obliged to:

• acceptance of Shipments for carriage in the places and dates specified in the Schedule of Service G, constituting Annex 1 to the contract,

• loading Shipments onto the vehicle and their placement in the vehicle,

• unloading Shipments from the vehicle in the places and dates specified in the Schedule of service G, constituting Annex 1 to the contract.

2) Volume of kilometers for the basic order to be executed for the course No. 10/440, 10/3333; vehicle category Ib from 1,3 to 3,5 tonnes; the length of the route in circulation 79 km; total number of circuits for the procedure 127; maximum number of km (with option right): 10 033 km (including the number of km covered by the basic contract (80%) 8 026; the number of km covered by the option right (20%) 2 007).

3) The template of the contract will be forwarded to the Contractor with the invitation to negotiate.

4) Contractual penalties will be provided for in the same cases as in the contract concluded

In the procedure on the basic order.

5) The obligations of the Contractor and the Ordering Party will be regulated on terms analogous to the contract concluded in the procedure for the basic order.

6) The Ordering Party may exercise the right of option on the same terms as in the contract concluded in the procedure for the basic order.

7) Order period: 6 months from the date of signing the contract.

8) Based on our experience, the Ordering Party estimates that for the proper implementation of the G Service it is necessary to have at least 1 car for each of the parts.