Finsing Primary and Middle School; Extension of the west wing
VE 401 Canal in terrain
Canal in the terrain:
-PP waste water pipes in the building (below floor slab) approx. 150m
-PP waste water pipes for greasy wastewater: approx. 50m
-PP drainage pipes in the terrain: approx. 50m
-PP-Regenwasserleitungen: ca. 200m
-Manholes for rainwater or dirty water: 4 pcs
-Nahwärmeleitung DN32: ca. 50m
-Fettabscheideranlage NS 5,5
-Packed rigs: 1 pcs.
-Gebäudedrainage
-Excavated earth for all installations: approx. 550m³