SWU-LIS2 | Charging Infrastructure LIS 2 Bus Depot | Tenderlake

SWU-LIS2 | Charging Infrastructure LIS 2 Bus Depot

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
20 April 2026
Closing Date:
18 May 2026
Location(s):
DE144 Ulm, Stadtkreis (DE Germany/DEUTSCHLAND)
Description:
Construction of a charging infrastructure for electric vehicles at the SWU depot, including 19 pantograph chargers and 5 connector chargers, to support the operation of 24 vehicles.

1. General
The SWU Verkehr GmbH (SWU) intends to carry out construction work for the establishment of a charging infrastructure for electric vehicles at the SWU depot as part of this tender. A site visit as the basis for the calculation can take place after consultation with the client and is considered mandatory by them.

2. Scope of the Construction Measure
Construction of charging infrastructure at the SWU depot. The charging infrastructure shall be installed on a paved area and serve 24 vehicles. 19 pantograph chargers will be installed to charge the newly procured electric buses of SWU. These must be capable of providing a maximum output of 300 kW in continuous operation, depending on the simultaneity. Additionally, 5 connector chargers CCS type 2 will be installed. These are to provide an output of 75 kW in continuous operation at a simultaneity of 1. At a lower simultaneity, a peak output of 150 kW should be possible.


LOT-0001
LOT-0001 SWU-LIS2
SWU-LIS2 | Charging Infrastructure Bus Depot.
1. General
The SWU Verkehr GmbH (SWU) intends to carry out construction work for the establishment of a charging infrastructure for electric vehicles at the SWU depot as part of this tender. A site visit as the basis for the calculation can take place after consultation with the client and is considered mandatory by them.

2. Scope of the Construction Measure
Construction of charging infrastructure at the SWU depot. The charging infrastructure shall be installed on a paved area and serve 24 vehicles. 19 pantograph chargers will be installed to charge the newly procured electric buses of SWU. These must be capable of providing a maximum output of 300 kW in continuous operation, depending on the simultaneity. Additionally, 5 connector chargers CCS type 2 will be installed. These are to provide an output of 75 kW in continuous operation at a simultaneity of 1. At a lower simultaneity, a peak output of 150 kW should be possible.

The Buyer:
SWU Verkehr GmbH
Additional information:
Link:
View Full Notice
Link:
Download Full Notice as PDF
Link:
Additional document: E89413199
CPV Code(s):
45317300 - Electrical installation work of electrical distribution apparatus