Under the contract, works will be carried out related to the project "MOBILITY CORRIDOR 'GREEN MAINLINE' IN TIMIȘOARA – BD. 16 DECEMBER 1989 – CALEA ȘAGULUI" - SMIS Code 356962, funded through the Regional West Program 2021-2027, in accordance with the requirements of the award documentation. The contracting authority will respond clearly and completely to all requests for clarifications/additional information, on the 12th day before the deadline set for submitting offers, provided that the requests are made at least 22 days before the deadline set for submitting offers. Clarifications submitted after this deadline will not be considered.
LOT-0000
Default lot.
Under the contract, works will be carried out related to the project "MOBILITY CORRIDOR 'GREEN MAINLINE' IN TIMIȘOARA – BD. 16 DECEMBER 1989 – CALEA ȘAGULUI" - SMIS Code 356962, funded through the Regional West Program 2021-2027, in accordance with the requirements of the award documentation. The works will include the modernization and rehabilitation of road infrastructure, the arrangement of dedicated public transport lanes, the creation of bicycle lanes and sidewalks, the installation and modernization of road signaling systems, the relocation and reconstruction of the public lighting network, as well as related urban works. Additionally, the project includes the installation of urban furniture and the arrangement of public spaces along the route, aimed at ensuring integrated, safe, and sustainable urban mobility. The total length of the route is approximately 2.5 km, on Bd. 16 December 1989 (partially) and Calea Șagului (partially). The designed route length is 2,439.97 m. Carriageway area = 53,872 sqm; Total length of bicycle lanes (including crossings of the carriageway) = 4,805 m, of which: - One-way lanes = 4,089 m; - Two-way lanes = 716 m; Bicycle lanes area = 8,070 sqm (excluding crossings of side streets); Sidewalk area – natural stone finish = 6,050 sqm; Sidewalk area – concrete paving finish = 13,000 sqm; Property accesses – natural stone finish = 620 sqm; Property accesses – concrete paving finish = 870 sqm.