The purpose of the purchase is to design, execute works, and put into operation the installations for producing electricity from renewable sources (photovoltaic panels) related to the 7 systems that will be located in 5 locations managed by AQUAVAS SA, namely:
• Inside the Wastewater Treatment Station in Vaslui
• Inside the Drinking Water Treatment Station in the Industrial Area of Vaslui
• Inside the Wastewater Treatment Station in Bârlad
• Near the Wastewater Treatment Station in Huși.
• Near the Wastewater Treatment Station in Negrești.
The duration of the contract is 48 months, of which: 12 months - the design and execution period, followed by a functional and commercial warranty period of 3 years for the photovoltaic parks.
Any interested economic operator can request clarifications or additional information regarding the awarding documentation only in SEAP, no later than 25 days before the deadline for submitting offers.
The contracting entity will respond to all requests for clarifications or additional information mentioned above 15 days before the established deadline for submitting offers.
LOT-0000
Default lot.
The purpose of the purchase is to design, execute works, and put into operation the installations for producing electricity from renewable sources (photovoltaic panels) related to the 7 systems that will be located in 5 locations managed by AQUAVAS SA, namely:
• Inside the Wastewater Treatment Station in Vaslui – proposed location with an area of 14,000 sqm;
• Inside the Drinking Water Treatment Station in the Industrial Area of Vaslui – proposed location with an area of 8,300 sqm;
• Inside the Wastewater Treatment Station in Bârlad, 3 locations – proposed locations with an area of 31,700 sqm;
• Near the Wastewater Treatment Station in Huși – proposed location with an area of 10,000 sqm;
• Near the Wastewater Treatment Station in Negrești – proposed location with an area of 5,000 sqm.