Renewal of the OD Mengerskirchen incl. pipeline construction
Traffic safetyLOT 1 (Road safety):
Setting up and operating the inter-local diversions, securing the construction site.
Construction servicesLOT 2 (Construction):
Sewer construction: 750 m sewer DN 250-600, 32 shafts, 120 main connections
Water pipe: 1800 m cast iron pipe DN 80 - 150, 120 house connections
Sidewalks/ancillary facilities: demolition of existing pavement system, 2670 m of curbs, 7,350 m² of paving area
Roadway: 10,000 m² asphalt pavement, 9,500 asphalt pavement (12 cm AC 22 T S, 6 cm AC 16 B S, 4 cm AC 11 D S)