The plan is to build a fire and rescue station with sheds for emergency vehicles of the Hamburg professional fire brigade. The building comprises around 5,600 m² GFA with dimensions of up to 95 x 40 m on a plot area of around 14,000 m². The building does not have a basement.
Furthermore, a 22 m high training tower will be built.
The construction site is located in HH-Finkenwerder on Aluminiumstraße between a petrol station to the north and the aluminium plants to the south, whose conveyor bridge spans the property to the east. Access to Aluminiumstraße is via Finkenwerder Straße.
The subject of the service is the civil engineering work with topsoil removal and removal, the earthworks for the
Laying of the supply and disposal lines, the earthworks for the construction of the foundation. The production
of the sewage and rainwater pipes, the empty conduits for the supply as well as pressure piping work for
Water pipes, outside and below the building.
Essential work:
7,500 tons of contaminated topsoil, LAGA >Z2, DK I
35 pcs precast concrete shafts DN 1000 for waste water and rainwater
4 pcs plastic seepage boxes
1 pc Grease trap made of concrete, NS 7
Jeweils 130 m PE-HD PE 100 SDR 17 Wasserrohre DN 50, DN 100, DN 200
2 hydrants, 3 gate valves
1 pc water meter shaft plastic DN 1000
680 m Polypropylene pipes DN 100
320 m Polypropylene pipes DN 150
50 m polypropylene pipes DN 200
700 m³ Schottertragschicht
1.400 m² Asphalttragschicht, AC 32 T N