The Montessori Förderkreis Rothenburg odTe V. plans to build a new Montessori elementary and middle school with after-school care in BA I and expansion of a single-field sports hall in BA II.
The primary school will have 4, the middle school 6 classes and the after-school care center 2 groups for a total of 213 students.
The plot has a total size of 16,680 m
The basic idea of the design is the connection of 3 building wings with a joint as the center. This forum serves as the heart of the school, which not only connects the 3 building parts, but also the floors with one another via an air space.
The load-bearing structure of the school building is designed as a reinforced concrete frame construction and is to be designed for an increase in all areas.
Overall, the new school is planned as a compact and very economical building. It brings together the currently separate Montessori branches - primary level in the Neusitz district and secondary level in the old town of Rothenburg under one roof.
The specification describes the construction of an elevator system with integrated fire control. The elevator has 2 stops and can be released using a key switch.