See II.2.4
For the installation of the 12 boxes ITE in modular construction, the AO must proceed to the purchase of Pendels. For each box ITE and MC, a double pendulum is provided at the head of the bed. This double pendulum has a dry and a wet part.
The shuttles must be installed by April 2023 at the latest.
The AO opts for this file not to use lots to have all deliveries and maintenance done by 1 provider.