The construction measure includes the replacement of the Dinscheder bridge including the erection of a temporary bridge.
Temporary bridge:
- approx. 360 m
- approx. 180 m
- Construct the superstructure of the temporary bridge as a system bridge.
New bridge replacement:
- approx. 2,500 m
- approx. 2,300 m
- approx. 1 080 m
- approx. 1 550 m
- install approx. 420 t reinforcing steel,
- install approx. 83 t prestressing steel,
- approx. 1,400 m
- approx. 610 m
- approx. 610 m
- make approx. 220 m of steel railing,
- approx. 400 m
road construction:
- approx. 1 900 m
- approx. 1 000 m
- install approx. 27 street gullies,
- Lay approx. 270 m connection cable,
- pick up approx. 650 m of curbs and set them again,
- install approx. 4 100 t frost protection layer,
- approx. 2,000 m
- approx. 1 900 m
- approx. 1,800 m