As part of the refurbishment of the Music and Congress Hall, the 2.9 kitchen cubes is to be largely rebuilt of the installed ventilation technology and its components.
Ventilation technology/MSR — dismantling existing duct: approx. 200 m
— Dismantling fans: 3 pcs.
— Installation of fans in existing equipment: 3 pcs.
— Exhaust fan box approx. 12 600 m
— new cooker hoods: 2 pcs,
— displacing existing hoods: 2 pcs.
— Exhaust fans (1 200 m
— spiral duct DN 100-250: approx. 70 lfdm,
— ventilation duct/fittings: approx. 380 m
— fire protection trim, ventilation duct: approx. 14 m
— swam outlets: 11 pcs, poppet valves: 17 pcs.,
— flow rate controller: 4 pcs., BSK DN 100- 700 x 700 x 500:11 pcs.
— Retrofit motor drive BSK: 8 pcs.
— Silencer: 8 pcs
MSR installation — integration of new fans, integration of BSKs into inventory automation
— Data points: approx. 62 pcs.
— control units for new fans,
— adjustment of temperature sensors,
- Wiring: approx. 1,400 rfdm.