Early construction of the temporary bridges with substructures for the replacement new building bridges over the Main-Danube Canal (1,416) and the southwest tangent (BW 1,417).
The present tender includes the construction, maintenance, maintenance and dismantling of two makeshift bridges across the Main-Danube Canal and SWT, including substructures and conducting static test loads on test piles to be fabricated.
The bridges are part of the behelf bypass for Hafenstraße and Finkenbrunn in the south of Nuremberg, which is required as part of the replacement new construction of the bridge over the Main-Danube Canal and the bridge over the southwest tangent in the course of the harbour road/Finkenbrunn. The makeshift bypass includes 2 lanes towards the city centre. During the construction period, traffic out of town as well as walking and cycling traffic pass through the existing bridges as well as the replacement new buildings of the bridges.