Carpentry - Kern Ost.
Carpentry work on all floors.
The work is carried out in partial areas of the respective floors and on each floor. There may be short-term interruptions in the work between the construction phases.
The work takes place during ongoing operations. Noisy work must not be carried out between 9:00 a.m. and 5:00 p.m.
- produce, deliver and assemble 4 pcs.
- Manufacture, supply and assemble 3 units of wash basin,
- 150 m
- Deliver and install 30 units of F30 system wall skylight glazing,
- Deliver and assemble 8 pieces of glass frame doors,
- Deliver and assemble 20 pcs. Toilet partitions,
- 32 m
- Deliver and assemble 18 mirrors,
- Deliver and assemble 2 internal door elements,
- 39 pcs. Mount existing door leaves.