In the Herz-Jesu Hospital, the 4th floor in the ward block is being converted into a geriatric focus.
It is particularly pointed out that the renovation will be carried out during ongoing operation, the renovation area comprises approx. 1,000 square meters.
Med. Gases for the construction of a geriatric ward at the Sacred Heart Hospital in Dernbach:
- 300 m of pipeline;
- 50 st tapping points;
- 1 floor lock box;
Disassembly work.