1. The subject of the contract is the supply of electricity to the Wrocław Stadium in Wrocław at Al. Śląskia 1, in the amount of approximately 4,200 MWh, for a period of 12 months (01.01.2023 – 31.12.2023), with the ordered capacity:
- PPE power supply NR 590322415104135385 (SI connection, 20kV) - 1 000 kW
- PPE power supply NR 590322415104090096 (SII connectors, 20kV) — 900 kW
Connection group: III.
Tariff group: B23.
Measurement and billing system installed at 20kV voltage in R-3808.
The Ordering Party informs that it is in the process of building a photovoltaic installation with a capacity of up to 600 kWp at the Stadium (Tarczyński Arena) with the launch at the end of 2022.
The repurchase of electricity will concern two PPEs in tariff group B23 listed in the PPE list at items 1 and 2. The Contracting Authority envisages introducing about 15% of the electricity produced into the Network, i.e. about 80 MWh during the term of the contract.
1. The subject of the contract is the supply of electricity to the Wrocław Stadium in Wrocław at Al. Śląskia 1, in the amount of approximately 4,200 MWh, for a period of 12 months (01.01.2023 – 31.12.2023), with the ordered capacity:
- PPE power supply NR 590322415104135385 (SI connection, 20kV) - 1 000 kW
- PPE power supply NR 590322415104090096 (SII connectors, 20kV) — 900 kW
Connection group: III.
Tariff group: B23.
Measurement and billing system installed at 20kV voltage in R-3808.
The Ordering Party informs that it is in the process of building a photovoltaic installation with a capacity of up to 600 kWp at the Stadium (Tarczyński Arena) with the launch at the end of 2022.
The repurchase of electricity will concern two PPEs in tariff group B23 listed in the PPE list at items 1 and 2. The Contracting Authority envisages introducing about 15% of the electricity produced into the Network, i.e. about 80 MWh during the term of the contract. The remaining (estimated) part of the generated electricity, i.e. approximately 460 MWh, will be used by the Ordering Party. The planned power of the sources assigned to each PPE separately is 299.7 kWp.
2. The estimated quantity of energy procured given in point 1 above is indicative in comparison of tenders and does not constitute on the part of the Contracting Authority an obligation to purchase energy in the quantity given. The Contractor shall not be entitled to any claim for the Contracting Authority's failure to collect the projected amount of energy.
3. Any change in the estimated estimated consumption will not result in additional costs for the Ordering Party, other than the settlement for the amount of energy actually consumed according to the prices specified in the tender documentation.
4. The energy supplier is obliged by the date of conclusion of the contract on the contract in question, to have a distribution agreement concluded with the distribution system operator (DSO) applicable to the objects of the Contracting Authority.