A 93 Rosenheim - Kiefersfelden; Section 1: AM Rosenheim - KH Brannenburg
New fiber optic cable system and new KH Brannenburg building
Cable trenches, construction pits in open construction, HDD bores, press-throughs with jacket pipe, delivery and laying of fiber optic and paper-insulated remote communication cables as well as cable protection pipes including calibration and pressure testing, delivery and blowing in of micro cable protection pipes, delivery and installation of cable ducts, pressure testing and calibration of existing cable protection pipes, delivery and Construction of cable house with equipment and outdoor facilities, cable assembly work on fiber optic and paper-insulated route telecommunication cables, surveying, stakeout and traffic safety work, explosive ordnance probing, clearing, cutbacks (small extent), game protection fence and steel protection plank work, manufacture of pavement and asphalt pavements (small extent).
A 93 Rosenheim - Kiefersfelden; Section 1: AM Rosenheim - KH Brannenburg
New fiber-optic cable system and new KH Brannenburg building;
- 7,600 m
- 1,050 m HDD bores and press-throughs with casing pipe;
- Delivery and laying of 25,600 m fiber optic and 9,100 m paper-insulated route communication cables;
- Delivery and laying of 37 800 m cable protection tubes d50 and 27 600 m cable protection tubes d110 including calibration and pressure test;
- Delivery and blowing of 90 100 m micro cable protection tubes 12 x 1.0;
- Delivery and installation of 26 cable ducts;
- pressure test and calibration of existing cable ducts d50 and d110;
- Delivery and construction of cable house with equipment and outdoor facilities;
- Cable assembly work on fiber optic and paper-insulated route telecommunication cables;
- surveying, staking and traffic safety work;
- Explosive ordnance, clearing and pruning (small extent), game protection fence and steel protection plank work;
- Manufacture of pavement and asphalt pavements (small scope).