Firm flat-rate share
- Item 0: Appropriation of input data (§5.2 of the CSTP)
- Item 1: Study of the centering of the package in the trolley (§5.3 of the CSTP)
- Item 2: Addition of a retractable centering element (§5.4 of the CSTP
Optional part
Item 3: Increase in container diameter and addition of a fixed centering element (Option 1)
Item 4: Reduction of the skirt diameter and addition of a fixed centering element (Option n°2)
Estimated share on prior estimate
Firm lump sum and associated deliverables
- Item 0: Appropriation of input data (§5.2 of the CSTP)
- Item 1: Study of the centering of the package in the trolley (§5.3 of the CSTP)
- Item 2: Addition of a retractable centering element (§5.4 of the CSTP
Optional share and associated deliverables
Item 3: Increase in container diameter and addition of a fixed centering element (Option 1)
Item 4: Reduction of the skirt diameter and addition of a fixed centering element (Option n°2)
Estimated share on prior estimate, the provision of which will be estimated at 10% of the contract price, based on the hourly and/or daily rates defined in the contract and which will be intended to draw up a specific safety case (SSA) in the context of a significant modification of the installation (conclusion of the preliminary safety analysis (DPA)